Methodology to include the comminution specific energy into open-pit strategy mine planning using global optimization

J. Mata, Alizeibek Saleimen Nader, D. Mazzinghy
{"title":"Methodology to include the comminution specific energy into open-pit strategy mine planning using global optimization","authors":"J. Mata, Alizeibek Saleimen Nader, D. Mazzinghy","doi":"10.4322/2176-1523.20222752","DOIUrl":null,"url":null,"abstract":"Strategic Mine Planning demands an accurate knowledge of the mineral deposit, being very important the use of block models supported by Geometallurgy. Currently, the methodology used considers the mine planning divided into parts (ultimate open pit, pushbacks, scheduling). Global optimization can guarantee the optimal solution once all steps are solved together. In the present study the database Marvin was used and the geometallurgical variable comminution specific energy was included. In the first scenario, called GeoMet1, a ramp-up was included in the first three years. In the GeoMet2, different maximum movement ranges were defined, as well as the implementation of ore stockpiles and their subsequent rehandling. Gains of 9.66% in NPV and 5.18% in ore production were found for GeoMet2. The second scenario presented ore production adhering to the programmed, in addition to greater stability in the stripping ratio. In addition, GeoMet2 was more efficient in controlling the comminution specific energy. Therefore, the implementation of mass movement limitations allied to the use of stockpiles favored the optimization of the mine scheduling results. It was possible to verify the importance of including the variable comminution specific energy in the block model, to provide more realistic and reliable results.","PeriodicalId":53327,"journal":{"name":"Tecnologia em Metalurgia Materiais e Mineracao","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2022-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Tecnologia em Metalurgia Materiais e Mineracao","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.4322/2176-1523.20222752","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

Strategic Mine Planning demands an accurate knowledge of the mineral deposit, being very important the use of block models supported by Geometallurgy. Currently, the methodology used considers the mine planning divided into parts (ultimate open pit, pushbacks, scheduling). Global optimization can guarantee the optimal solution once all steps are solved together. In the present study the database Marvin was used and the geometallurgical variable comminution specific energy was included. In the first scenario, called GeoMet1, a ramp-up was included in the first three years. In the GeoMet2, different maximum movement ranges were defined, as well as the implementation of ore stockpiles and their subsequent rehandling. Gains of 9.66% in NPV and 5.18% in ore production were found for GeoMet2. The second scenario presented ore production adhering to the programmed, in addition to greater stability in the stripping ratio. In addition, GeoMet2 was more efficient in controlling the comminution specific energy. Therefore, the implementation of mass movement limitations allied to the use of stockpiles favored the optimization of the mine scheduling results. It was possible to verify the importance of including the variable comminution specific energy in the block model, to provide more realistic and reliable results.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
采用全局优化方法将粉碎比能纳入露天矿战略矿山规划
战略矿山规划要求对矿床有准确的了解,这对使用地质冶金学支持的块体模型是非常重要的。目前所采用的方法是将矿山规划分为几个部分(最终露天矿、回推、调度)。全局优化可以保证所有步骤一起求解得到最优解。本研究采用Marvin数据库,并引入了地冶金变量粉碎比能。在第一个方案(称为GeoMet1)中,前三年将增加产量。在GeoMet2中,定义了不同的最大移动范围,以及矿石库存的实施及其随后的再处理。GeoMet2的净现值增加了9.66%,矿石产量增加了5.18%。在第二种情况下,除了剥出比更稳定外,矿石产量也符合计划。此外,GeoMet2在控制粉碎比能方面更有效。因此,实施与库存使用相关的大规模移动限制有利于优化矿山调度结果。可以验证在块模型中加入可变粉碎比能的重要性,以提供更真实可靠的结果。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
40
审稿时长
12 weeks
期刊最新文献
Projeto, construção e validação de um tribômetro ball-cratering de configuração mecânica esfera-fixa Influência das temperaturas de pré e pós-aquecimento sobre a formação de trincas induzidas por hidrogênio na soldagem de reparo de aços AISI D6 Study of the polystyrene degradation in water using nanoparticle tracking analysis (NTA) Flotação seletiva de minério fosfático sílico-carbonatado com coletores anfotéricos Pré-concentração de minério de ouro para caracterização das formas de ocorrência e associações minerais
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1