METHODOLOGY FOR CALCULATING THE STRESS STATE OF THE PILLAR FOR THE SALVAGE CHAMBER IN THE PRESENCE OF AN ADJACENT MINED OUT LONGWALL

IF 0.1 Q4 GEOSCIENCES, MULTIDISCIPLINARY Proceedings of the Tula States University-Sciences of Earth Pub Date : 2021-01-01 DOI:10.46689/2218-5194-2021-4-1-364-374
I. Ermakova, V. Fedusov
{"title":"METHODOLOGY FOR CALCULATING THE STRESS STATE OF THE PILLAR FOR THE SALVAGE CHAMBER IN THE PRESENCE OF AN ADJACENT MINED OUT LONGWALL","authors":"I. Ermakova, V. Fedusov","doi":"10.46689/2218-5194-2021-4-1-364-374","DOIUrl":null,"url":null,"abstract":"Analysis of salvage operations at the underground mines of JSC SUEK-Kuzbass has shown that they can have different locations relative to the previously mined out adjacent longwall, which has a significant impact on the duration of salvage operations. If there is a previously mined out adjacent longwall next to the salvage chamber, the duration of salvage operations increases significantly, in contrast to the case when the salvage chamber is located within a pillar, outside the zone affected by the previously mined out longwall. In this regard, the calculation of the stress state of the pillar for the salvage chamber in the presence of an ad-jacent previously mined out longwall is a relevant task. The paper presents a methodology for quantitative assessment of the stress affecting the pillar for the salvage chamber, based on the use of the finite element method. An example of calculating the stress on the pillar for the sal-vage chamber in the presence of an adjacent mined out longwall for specific geological and mining conditions is considered. It has been established that the presence of a previously mined out adjacent longwall causes additional load on the specified pillar. The highest load factors are observed in the edge part of the pillar near the ventilation gateroad.","PeriodicalId":41869,"journal":{"name":"Proceedings of the Tula States University-Sciences of Earth","volume":"421 1","pages":""},"PeriodicalIF":0.1000,"publicationDate":"2021-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the Tula States University-Sciences of Earth","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.46689/2218-5194-2021-4-1-364-374","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"GEOSCIENCES, MULTIDISCIPLINARY","Score":null,"Total":0}
引用次数: 0

Abstract

Analysis of salvage operations at the underground mines of JSC SUEK-Kuzbass has shown that they can have different locations relative to the previously mined out adjacent longwall, which has a significant impact on the duration of salvage operations. If there is a previously mined out adjacent longwall next to the salvage chamber, the duration of salvage operations increases significantly, in contrast to the case when the salvage chamber is located within a pillar, outside the zone affected by the previously mined out longwall. In this regard, the calculation of the stress state of the pillar for the salvage chamber in the presence of an ad-jacent previously mined out longwall is a relevant task. The paper presents a methodology for quantitative assessment of the stress affecting the pillar for the salvage chamber, based on the use of the finite element method. An example of calculating the stress on the pillar for the sal-vage chamber in the presence of an adjacent mined out longwall for specific geological and mining conditions is considered. It has been established that the presence of a previously mined out adjacent longwall causes additional load on the specified pillar. The highest load factors are observed in the edge part of the pillar near the ventilation gateroad.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
在邻近采出长壁存在的情况下打捞室矿柱应力状态的计算方法
对JSC SUEK-Kuzbass地下矿山打捞作业的分析表明,地下矿山相对于之前开采的相邻长壁可能有不同的位置,这对打捞作业的持续时间有很大的影响。如果打捞室旁边有先前开采的相邻长壁,则打捞作业的持续时间明显增加,而打捞室位于矿柱内,不在先前开采的长壁影响区域内。在此背景下,在存在相邻已开采长壁的情况下,打捞室矿柱的应力状态计算是一项相关的任务。本文提出了一种基于有限元法的救助室柱应力定量评估方法。结合具体的地质和开采条件,计算了相邻采空区长壁存在时瓦斯硐室矿柱应力的计算实例。已经确定存在先前开采的相邻长壁会对指定矿柱产生额外载荷。在靠近通风门道的矿柱边缘处,荷载系数最高。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
CALCULATION OF THE SCREW CONVEYOR OF THE MIXED GROUND SHIELD TUNNEL BORING MACHINES SEVERAL ASPECTS OF THE ADAPTATION METHODOLOGY OF MOTOR-CONVEYOR TRANSPORT AND DEVELOPING MINING SYSTEM ON AN OPEN PIT ABOUT GENETIC CLASSIFICATIONS OF CRACKS ROCKS DEVELOPMENT OF A DIGITAL GAS ECOSYSTEM ON THE BASIS OF A COMPREHENSIVE SCIENTIFIC AND TECHNICAL PROGRAM OF A FULL INNOVATIVE CYCLE DEFELOPMENT OF THE OVERALL RISK ASSESSMENT METHODOLOGY FOR A HAZARDS COMPLEX OF UNDERGROUND MINING ENTERPRISES
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1