Variability Analysis of Prime Cost Sums

I. J. Ikpo
{"title":"Variability Analysis of Prime Cost Sums","authors":"I. J. Ikpo","doi":"10.9744/CED.10.1.PP.","DOIUrl":null,"url":null,"abstract":"This paper investigated the variability levels of prime cost sums in building projects in order to establish the reliability of such estimates in bills of quantities. It involved a purposive sampling of forty-six executed projects in South-western Nigeria from which data on estimated and final prime cost sums as well as estimated and final contract sums were procured. Ratios interrelating the four variables were generated and their mean values determined. The mean prime cost sum overrun was found to be 41% of the estimated sums. However, a negative relationship between the prime cost sums and the final contract sums was established. Based on observed variations, models were developed to predict any of the ratios in general, and specifically, the practical prime cost range in order to effectively control overall project costs.","PeriodicalId":30107,"journal":{"name":"Civil Engineering Dimension","volume":"10 1","pages":"40-44"},"PeriodicalIF":0.0000,"publicationDate":"2008-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Civil Engineering Dimension","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.9744/CED.10.1.PP.","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

Abstract

This paper investigated the variability levels of prime cost sums in building projects in order to establish the reliability of such estimates in bills of quantities. It involved a purposive sampling of forty-six executed projects in South-western Nigeria from which data on estimated and final prime cost sums as well as estimated and final contract sums were procured. Ratios interrelating the four variables were generated and their mean values determined. The mean prime cost sum overrun was found to be 41% of the estimated sums. However, a negative relationship between the prime cost sums and the final contract sums was established. Based on observed variations, models were developed to predict any of the ratios in general, and specifically, the practical prime cost range in order to effectively control overall project costs.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
主要成本总和的可变性分析
本文研究了建筑工程中主要成本总额的变化水平,以建立这种估算在工程量清单中的可靠性。它对尼日利亚西南部46个已执行的项目进行了有目的的抽样,从中获得了估计和最终主要费用总额以及估计和最终合同金额的数据。生成四个变量的相互关系比率,并确定其平均值。平均超支的主要成本总额占估计总额的41%。然而,主要成本总额与最终合同总额之间存在负相关关系。基于观察到的变化,开发了模型来预测一般的任何比率,特别是实际的主要成本范围,以便有效地控制整个项目成本。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
15
审稿时长
24 weeks
期刊最新文献
Laboratory Study on Vallejo and Scovazzo’s Methods in Estimating the Rheology Parameters of Bentonite and Kaolinite Muds Influence of Prefabrication on Job Satisfaction in The Construction Industry Stress Analysis of Pin Connections in Steel Box Girder with the Unibridge System using Finite Element Model Monitoring and Analysis of Coastline Changes in the Coastal Area of Bali Island, Indonesia Free-Vibration and Buckling Analyses of Beams using Kriging-Based Timoshenko Beam Elements with the Discrete Shear Gap Technique
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1