S. Milton, S. Biedron, P. Den Hartog, J. Lewellen, E. Moog, A. Nassiri, G. Travish
{"title":"The APS SASE FEL: status and commissioning results","authors":"S. Milton, S. Biedron, P. Den Hartog, J. Lewellen, E. Moog, A. Nassiri, G. Travish","doi":"10.1109/PAC.1999.792738","DOIUrl":null,"url":null,"abstract":"A self-amplified spontaneous emission (SASE) free-electron laser (FEL) is under construction at the Advanced Photon Source (APS). Three gun systems, an rf-test area, laser room, numerous diagnostics, a transfer line at the end of the linac and a new building, which will serve as the experimental hall, have been added. The only remaining items to be installed are the undulators into the beamline. Here, the additions to the APS in support of this project as well as commissioning results and future plans will be discussed.","PeriodicalId":20453,"journal":{"name":"Proceedings of the 1999 Particle Accelerator Conference (Cat. No.99CH36366)","volume":"13 1","pages":"2483-2485 vol.4"},"PeriodicalIF":0.0000,"publicationDate":"1999-04-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the 1999 Particle Accelerator Conference (Cat. No.99CH36366)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PAC.1999.792738","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2
Abstract
A self-amplified spontaneous emission (SASE) free-electron laser (FEL) is under construction at the Advanced Photon Source (APS). Three gun systems, an rf-test area, laser room, numerous diagnostics, a transfer line at the end of the linac and a new building, which will serve as the experimental hall, have been added. The only remaining items to be installed are the undulators into the beamline. Here, the additions to the APS in support of this project as well as commissioning results and future plans will be discussed.