PENERAPAN ALAT BANTU LIFTER BRIDGE UNTUK MENGURANGI WAKTU DAN JARAK TEMPUH DALAM PEMINDAHAN BARANG SETENGAH JADI DI PT. TMMIN

Yulvani Anggi Rahmawati
{"title":"PENERAPAN ALAT BANTU LIFTER BRIDGE UNTUK MENGURANGI WAKTU DAN JARAK TEMPUH DALAM PEMINDAHAN BARANG SETENGAH JADI DI PT. TMMIN","authors":"Yulvani Anggi Rahmawati","doi":"10.30736/jt.v13i2.659","DOIUrl":null,"url":null,"abstract":"PT TMMIN's logistics department is responsible for the smooth supply of component parts to the production line. In the delivery of parts, there is a problem, namely traffic disturbances in the PAD supply with the supply ip module. Both supplies cannot be in the same area due to insufficient area space. This situation causes the operator's workload to be a waste of steps and time. To overcome this problem, it is proposed to replace the part delivery tool that is currently used with a push dolly with a karakuri lifter bridge. Tool changes are carried out with 3M+1E aspects, namely method, material, man and environment. Change of equipment can affect factors such as no traffic disruptions with other supplies, reduction of SPS area, reduction of SPS distance to pp module and increasing company productivity efficiency.","PeriodicalId":17707,"journal":{"name":"Jurnal Qua Teknika","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2021-09-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Qua Teknika","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.30736/jt.v13i2.659","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

PT TMMIN's logistics department is responsible for the smooth supply of component parts to the production line. In the delivery of parts, there is a problem, namely traffic disturbances in the PAD supply with the supply ip module. Both supplies cannot be in the same area due to insufficient area space. This situation causes the operator's workload to be a waste of steps and time. To overcome this problem, it is proposed to replace the part delivery tool that is currently used with a push dolly with a karakuri lifter bridge. Tool changes are carried out with 3M+1E aspects, namely method, material, man and environment. Change of equipment can affect factors such as no traffic disruptions with other supplies, reduction of SPS area, reduction of SPS distance to pp module and increasing company productivity efficiency.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
电梯桥辅助设备的应用,以减少时间和距离的移动在PT TMMIN一半
PT TMMIN的物流部门负责将零部件顺利供应到生产线。在零件的交付中,出现了一个问题,即PAD供应与供应ip模块的交通干扰。由于区域空间不足,两个供应品不能在同一区域。这种情况导致操作人员的工作量浪费了步骤和时间。为了克服这一问题,建议将目前使用推车的零件交付工具替换为卡拉库里升降桥。刀具变更从3M+1E方面进行,即方法、材料、人员和环境。设备的变化可以影响诸如与其他供应的交通中断,减少SPS面积,减少SPS到pp模块的距离以及提高公司的生产力效率等因素。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
PEMILIHAN SUPPLIER MINYAK JELANTAH BAHAN BAKU BIOSOLAR DENGAN METODE ELECTRE SISTEM PENDUKUNG KEPUTUSAN PENERIMA PKH MENGGUNAKAN METODE SAW KAJIAN ENERGI SPESIFIK PADA BENDUNG BERTANGGA DENGAN VARIASI KEMIRINGAN HULU PADA SALURAN PERSEGI ALAT PROYEK MIKRO KONTROL PENGHAPUS PAPAN TULIS OTOMATIS MENGGUNAKAN REMOTE BERBASIS ARDUINO Prefix SISTEM PENGISIAN AIR PADA TANKI PEMBUATAN ROTI DENGAN METODE FUZZY LOGIC MENGGUNAKAN ARDUINO
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1