A Combined AHP-GP for Maintenance Project Selection in Coal Power Plant

H. Setiyawan, U. Ciptomulyono
{"title":"A Combined AHP-GP for Maintenance Project Selection in Coal Power Plant","authors":"H. Setiyawan, U. Ciptomulyono","doi":"10.12962/J23546026.Y2020I3.11232","DOIUrl":null,"url":null,"abstract":"A proper maintenance project selection is a key to support performance of power plant. The issue of maintenance is allocation a limited budget to achieve the goals of various maintenance criteria and conflicting objectives. This paper presents an integrated AHP and goal programming. In the first step, since maintenance is measured in qualitative criteria, it is recommended to use AHP to weight and quantify criteria. Second step utilize GP which uses the criteria weights and alternative priorities calculated with AHP to optimize multiple objectives without exceeding available resource constraint. The results show that the approach can aid in selection optimal projects within available budget.","PeriodicalId":14533,"journal":{"name":"IPTEK Journal of Proceedings Series","volume":"74 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2021-10-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"IPTEK Journal of Proceedings Series","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.12962/J23546026.Y2020I3.11232","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

A proper maintenance project selection is a key to support performance of power plant. The issue of maintenance is allocation a limited budget to achieve the goals of various maintenance criteria and conflicting objectives. This paper presents an integrated AHP and goal programming. In the first step, since maintenance is measured in qualitative criteria, it is recommended to use AHP to weight and quantify criteria. Second step utilize GP which uses the criteria weights and alternative priorities calculated with AHP to optimize multiple objectives without exceeding available resource constraint. The results show that the approach can aid in selection optimal projects within available budget.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
基于AHP-GP的火电厂维修方案选择
合理的维修方案选择是保证电厂正常运行的关键。维护的问题是分配有限的预算来实现各种维护标准和相互冲突的目标。本文提出了一种层次分析法与目标规划相结合的方法。在第一步中,由于维护是在定性标准中度量的,因此建议使用AHP对标准进行加权和量化。第二步利用遗传算法,利用层次分析法计算出的标准权重和备选优先级,在不超出可用资源约束的情况下对多个目标进行优化。结果表明,该方法有助于在预算范围内选择最优方案。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Increasing The Quality and Quantity of Marine Processed Production in Fisherman Villages Assistance of Handicraft Small Business in Increasing Capacity Greenhouse Potential based on Ecotourism and Education for Sustainable Village Economic Resilience Developing New Indonesia Circular Economy Indicators: A Lesson Learnt from European Union A Review of Circular Economy Index from Many Perspective
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1