{"title":"Analysis of Technical and Economics Overhead Transmission Line 150 kV Construction from Mine Mouth Coal Fired Power Plant to External Customer Substation","authors":"Elpatra Hadi, R. Setiabudy","doi":"10.24036/jptk.v6i2.32723","DOIUrl":null,"url":null,"abstract":"Mine Mouth Steam Coal Fired Power Plant (PLTU) has a capacity of 2x18MW while the power supplied to internal consumers is 3.6MW or around 10% of the total generating capacity (20% of one generating unit). To operate according to its specifications, the load is increased by operating the load bank. The small internal load and use of the loadbank cause the cost of generation to be high. Excess generating capacity can be sold to external consumers outside the mining area, so it is necessary to build one circuit overhead transmission line 150kV as long 48.38km. The construction of  overhead transmission line 150kV from the PLTU to the external consumer substation can increase sales of electricity and can replace the loadbank function. This study aims to evaluate the technical feasibility and economic aspects of the construction overhead transmission line 150kV from the PLTU to an external consumer substation. The research method uses financial indicators IRR, NPV and ROI. Overall, the construction of one circuit overhead transmission line 150kV can increase sales of electricity and replace the function of load bank. The NPV value is IDR 1,604,887,094 with an IRR of 12.53%, and ROI of 9.03 years.","PeriodicalId":55675,"journal":{"name":"Jurnal Pendidikan Teknologi dan Kejuruan","volume":"29 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2023-05-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Pendidikan Teknologi dan Kejuruan","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.24036/jptk.v6i2.32723","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Mine Mouth Steam Coal Fired Power Plant (PLTU) has a capacity of 2x18MW while the power supplied to internal consumers is 3.6MW or around 10% of the total generating capacity (20% of one generating unit). To operate according to its specifications, the load is increased by operating the load bank. The small internal load and use of the loadbank cause the cost of generation to be high. Excess generating capacity can be sold to external consumers outside the mining area, so it is necessary to build one circuit overhead transmission line 150kV as long 48.38km. The construction of  overhead transmission line 150kV from the PLTU to the external consumer substation can increase sales of electricity and can replace the loadbank function. This study aims to evaluate the technical feasibility and economic aspects of the construction overhead transmission line 150kV from the PLTU to an external consumer substation. The research method uses financial indicators IRR, NPV and ROI. Overall, the construction of one circuit overhead transmission line 150kV can increase sales of electricity and replace the function of load bank. The NPV value is IDR 1,604,887,094 with an IRR of 12.53%, and ROI of 9.03 years.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
矿井口燃煤电厂至外部用户变电站150kv架空输电线路建设技术经济分析
矿井口动力燃煤电厂(PLTU)的容量为2x18MW,而向内部用户提供的电力为3.6MW或约占总发电量的10%(一个发电机组的20%)。为了按照其规格操作,通过操作负载组来增加负载。小的内部负荷和负载组的使用导致发电成本高。多余的发电量可以出售给矿区外的外部用户,因此需要建设一条150kV的架空输电线路,长度为48.38km。从PLTU到外部用户变电站的150kV架空输电线路的建设可以增加电力的销售,并可以取代负载库的功能。本研究旨在评估从PLTU到外部用户变电站的150kV架空输电线路建设的技术可行性和经济方面。研究方法采用财务指标IRR、NPV和ROI。总的来说,建设一条150kV架空输电线路可以增加电力销售,替代负荷库的功能。净现值为1,604,887,094印尼盾,内部收益率为12.53%,投资回报率为9.03年。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
20
审稿时长
24 weeks
期刊最新文献
Evaluation of the program for modeling and implementation of a virtual laboratory for solid-state electronics The effect of peer lesson strategy on learning outcomes of building construction and land measurement techniques Penerapan Problem Based Learning dengan Menerapkan Teknik Windows Shopping untuk Meningkatkan Motivasi Belajar Peningkatan Partisipasi dan Penguasaan Vocabulary Siswa Kelas VII A SMP 1 Kabat Menggunakan Media Flashcard Pengelompokan Gaya Belajar Secara Homogen dalam Mendukung Pembelajaran Diferensiasi Proses Siswa
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1