Solving resource-constrained project scheduling problem by genetic algorithm

S. U. Kadam, Narendra S. Kadam
{"title":"Solving resource-constrained project scheduling problem by genetic algorithm","authors":"S. U. Kadam, Narendra S. Kadam","doi":"10.1109/ICBIM.2014.6970966","DOIUrl":null,"url":null,"abstract":"This paper proposes a genetic algorithm to solve resource constrained project scheduling problem, in which resources are optimally allocated to tasks. Resources are renewable. In RCPSP each activity is executing in single mode. This work employed genetic algorithm to schedule project task to minimize makespan respect to resource constraint and precedence constraint. The Schedule Generation Scheme was used to decode project plan. The approach was tested on a set of standard problem obtained from Project Scheduling Problem Library (PSLIB) and algorithm given in this paper was compared with the existing optimization algorithm, the result reveals that the algorithm is effective for the RCPSP.","PeriodicalId":6549,"journal":{"name":"2014 2nd International Conference on Business and Information Management (ICBIM)","volume":"1 1","pages":"159-164"},"PeriodicalIF":0.0000,"publicationDate":"2014-12-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"11","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2014 2nd International Conference on Business and Information Management (ICBIM)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICBIM.2014.6970966","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 11

Abstract

This paper proposes a genetic algorithm to solve resource constrained project scheduling problem, in which resources are optimally allocated to tasks. Resources are renewable. In RCPSP each activity is executing in single mode. This work employed genetic algorithm to schedule project task to minimize makespan respect to resource constraint and precedence constraint. The Schedule Generation Scheme was used to decode project plan. The approach was tested on a set of standard problem obtained from Project Scheduling Problem Library (PSLIB) and algorithm given in this paper was compared with the existing optimization algorithm, the result reveals that the algorithm is effective for the RCPSP.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
利用遗传算法求解资源受限的项目调度问题
提出了一种求解资源约束项目调度问题的遗传算法,使资源最优分配给任务。资源是可再生的。在RCPSP中,每个活动都以单一模式执行。在考虑资源约束和优先级约束的情况下,采用遗传算法对项目任务进行调度,使最大完工时间最小化。采用进度生成方案对项目计划进行解码。在项目调度问题库(PSLIB)中的一组标准问题上对该方法进行了测试,并将本文算法与现有的优化算法进行了比较,结果表明该算法对RCPSP是有效的。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
A Novel and Efficient Rough Set Based Clustering Technique for Gene Expression Data An empirical study on the determinants of capital structure in Indian Cement Industry in Pre and Post period of Recession Modified Ant Colony Optimization to enhance MANET routing in Adhoc on demand Distance Vector Feasibility of mobile based learning in higher education institutions in India A threshold based Directional Weighted Median Filter for Removal of Random Impulses in thermal images
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1