{"title":"Combining BIM and lean methods for scheduling for verifying and communicating demolition processes in an early project stage","authors":"Dominik Steuer, Svenja Lauble, Shervin Haghsheno","doi":"10.35490/ec3.2023.162","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":7326,"journal":{"name":"Advances in Informatics and Computing in Civil and Construction Engineering","volume":"51 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2023-07-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Advances in Informatics and Computing in Civil and Construction Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.35490/ec3.2023.162","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}