Hélio Alves Pedrosa, F. Colbert, F. Garcia, R. Gachet, Alberto Carlos Boldrini, Jose Marcio De Souza, Marcelo Oliveira Carrara, R. Okullo, Joan Hernandez Belisario, Ly Amaury Lacerda, D. Goyallon
{"title":"Stimulation Workflow Applied on LAPA Pre-Salt Carbonate Field Deep-Water Brazil","authors":"Hélio Alves Pedrosa, F. Colbert, F. Garcia, R. Gachet, Alberto Carlos Boldrini, Jose Marcio De Souza, Marcelo Oliveira Carrara, R. Okullo, Joan Hernandez Belisario, Ly Amaury Lacerda, D. Goyallon","doi":"10.2118/207370-ms","DOIUrl":null,"url":null,"abstract":"\n Lapa is a pre-salt deep-water field located around 270km off the coast of São Paulo, Brazil at Santos basin. This carbonate reservoir lies in water depths of around 2,100m and can produce good quality light 26° API oil. The stimulation in large carbonate reservoirs is very challenging, and techniques used for Lapa were based on chemical divergence. The development in offshore environments requires proper planning, execution, and monitoring to achieve the desired results and, of course, profitability.\n The matrix acidizing method was chosen to stimulate all wells of this campaign (2 producers and 2 injectors). This method consists of bypassing formation damage and stimulating the reservoir by creating wormholes via chemical pumping. In the design phase, stimulation operations previously performed at this field were reviewed, analyzed, and optimized. The main changes were regarding the completion strategy without the use of coiled tubing and placement during the completion phase as it could optimize the time and the cost for the project. The volumetric rate (gal/ft) was also reduced and the selection of the main fluid changed after several laboratory analysis and software simulations.\n The Lapa field requires high fluid volumes due to the length of the intended treatment interval. The assembly of a stimulation plant on a supply vessel from operator fleet (multi-purpose FSV – field support vessel) was the most cost-efficient approach to address the high volumes required as there was no Well Stimulation Vessel (WSV) available \"on call\" in the Brazilian offshore market at that time. This solution could also optimize the vessel fleet while the vessel was not required for pumping as FSV was also equipped with ROV and was mean to carry subsea planned task. The fluid test strategy was also a key point for this successful project as many tests were performed to make sure that the correct fluid system was selected. During this process, several fluid systems and different formulations were submitted for core flow tests and dual core flow tests to evaluate worm holing efficiency of retarded fluids and diversion performance of Chemical diverters. Compatibility tests were also performed, and a mud cake breaker was developed locally, especially for this project.\n This paper will bring an overview of all aspects regarding Lapa stimulation project since the conception, fluid system selection, laboratory tests, lessons learned and the potentially future strategy for this field.","PeriodicalId":10959,"journal":{"name":"Day 3 Wed, November 17, 2021","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2021-12-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 3 Wed, November 17, 2021","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/207370-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
Lapa is a pre-salt deep-water field located around 270km off the coast of São Paulo, Brazil at Santos basin. This carbonate reservoir lies in water depths of around 2,100m and can produce good quality light 26° API oil. The stimulation in large carbonate reservoirs is very challenging, and techniques used for Lapa were based on chemical divergence. The development in offshore environments requires proper planning, execution, and monitoring to achieve the desired results and, of course, profitability.
The matrix acidizing method was chosen to stimulate all wells of this campaign (2 producers and 2 injectors). This method consists of bypassing formation damage and stimulating the reservoir by creating wormholes via chemical pumping. In the design phase, stimulation operations previously performed at this field were reviewed, analyzed, and optimized. The main changes were regarding the completion strategy without the use of coiled tubing and placement during the completion phase as it could optimize the time and the cost for the project. The volumetric rate (gal/ft) was also reduced and the selection of the main fluid changed after several laboratory analysis and software simulations.
The Lapa field requires high fluid volumes due to the length of the intended treatment interval. The assembly of a stimulation plant on a supply vessel from operator fleet (multi-purpose FSV – field support vessel) was the most cost-efficient approach to address the high volumes required as there was no Well Stimulation Vessel (WSV) available "on call" in the Brazilian offshore market at that time. This solution could also optimize the vessel fleet while the vessel was not required for pumping as FSV was also equipped with ROV and was mean to carry subsea planned task. The fluid test strategy was also a key point for this successful project as many tests were performed to make sure that the correct fluid system was selected. During this process, several fluid systems and different formulations were submitted for core flow tests and dual core flow tests to evaluate worm holing efficiency of retarded fluids and diversion performance of Chemical diverters. Compatibility tests were also performed, and a mud cake breaker was developed locally, especially for this project.
This paper will bring an overview of all aspects regarding Lapa stimulation project since the conception, fluid system selection, laboratory tests, lessons learned and the potentially future strategy for this field.