Risk Assessment of International Project Contracting Based on Unascertained Set

Shujing Zhou, Li Liu, Chao Wu, Yancang Li
{"title":"Risk Assessment of International Project Contracting Based on Unascertained Set","authors":"Shujing Zhou, Li Liu, Chao Wu, Yancang Li","doi":"10.1109/IWISA.2009.5073098","DOIUrl":null,"url":null,"abstract":"To management the risk of International Project Contracting where the chance and risk are accreted and the risk is bigger than the domestic engineering, the paper sets up the comprehensive evaluation system and a model of risk assessment by using the unascertained set for evaluating the risk of the international project contracting. Finally, the practicality and feasibility of the model are illustrated by the engineering practice.","PeriodicalId":6327,"journal":{"name":"2009 International Workshop on Intelligent Systems and Applications","volume":"42 1","pages":"1-4"},"PeriodicalIF":0.0000,"publicationDate":"2009-05-23","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2009 International Workshop on Intelligent Systems and Applications","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IWISA.2009.5073098","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

To management the risk of International Project Contracting where the chance and risk are accreted and the risk is bigger than the domestic engineering, the paper sets up the comprehensive evaluation system and a model of risk assessment by using the unascertained set for evaluating the risk of the international project contracting. Finally, the practicality and feasibility of the model are illustrated by the engineering practice.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
基于未确知集的国际工程承包风险评估
针对国际工程承包机会和风险都较大且风险大于国内工程的风险管理问题,本文建立了综合评价体系和未确知集风险评价模型,对国际工程承包风险进行了评价。最后,通过工程实践验证了该模型的实用性和可行性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Intelligent Systems and Applications: Select Proceedings of ICISA 2022 Selecting Accurate Classifier Models for a MERS-CoV Dataset A Method of Same Frequency Interference Elimination Based on Adaptive Notch Filter Research on Work-in-Progress Control System of Integrating PI and SPC Study on A Novel Fuzzy PLL and Its Application
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1