{"title":"Towards ITER construction","authors":"R. Aymar","doi":"10.1109/FUSION.2002.1027629","DOIUrl":null,"url":null,"abstract":"Following the end of the Engineering Design Activities (EDA) in July 2001, all the essential elements are now available to make a decision to construct ITER. The design has been elaborated to the extent necessary to allow a realistic assessment of its feasibility, performance and cost at a generic site, and R&D has been carried out to underpin the design choices. The project is now entering a phase of preparation for construction which addresses the issues arising from the creation of an ITER Legal Entity (ILE) at a particular site, and prepares for its establishment and formal acceptance of all commitments by host and participating countries during construction, exploitation and decommissioning. In parallel to the development of legal and contractual agreements, this phase will move the project technically from the drawing boards of the EDA Joint Central Team and ITER Parties' Home Teams to a state of readiness for the procurement by industry of the longest lead items, and for formal application for a construction license with the host country.","PeriodicalId":44192,"journal":{"name":"NINETEENTH CENTURY MUSIC","volume":"67 1","pages":"1-9"},"PeriodicalIF":0.3000,"publicationDate":"2002-11-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"5","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"NINETEENTH CENTURY MUSIC","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/FUSION.2002.1027629","RegionNum":1,"RegionCategory":"艺术学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"0","JCRName":"MUSIC","Score":null,"Total":0}
引用次数: 5
Abstract
Following the end of the Engineering Design Activities (EDA) in July 2001, all the essential elements are now available to make a decision to construct ITER. The design has been elaborated to the extent necessary to allow a realistic assessment of its feasibility, performance and cost at a generic site, and R&D has been carried out to underpin the design choices. The project is now entering a phase of preparation for construction which addresses the issues arising from the creation of an ITER Legal Entity (ILE) at a particular site, and prepares for its establishment and formal acceptance of all commitments by host and participating countries during construction, exploitation and decommissioning. In parallel to the development of legal and contractual agreements, this phase will move the project technically from the drawing boards of the EDA Joint Central Team and ITER Parties' Home Teams to a state of readiness for the procurement by industry of the longest lead items, and for formal application for a construction license with the host country.
期刊介绍:
19th-Century Music covers all aspects of Western art music between the mid-eighteenth and mid-twentieth centuries. We welcome--in no particular order--considerations of composers and compositions, styles, performance, historical watersheds, cultural formations, critical methods, musical institutions, ideas, and topics not named on this list. Our aim is to publish contributions to ongoing conversations at the leading edge of musical and multidisciplinary scholarship.