Scheduling in a flexible flow shop with unrelated parallel machines and machine-dependent process stages: trade-off between Makespan and production costs
A. Hasani, Seyed Mohammad Hassan Hosseini, S. Sana
{"title":"Scheduling in a flexible flow shop with unrelated parallel machines and machine-dependent process stages: trade-off between Makespan and production costs","authors":"A. Hasani, Seyed Mohammad Hassan Hosseini, S. Sana","doi":"10.1016/j.samod.2022.100010","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":101193,"journal":{"name":"Sustainability Analytics and Modeling","volume":"8 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Sustainability Analytics and Modeling","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1016/j.samod.2022.100010","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}