Limestone Mining and Slope Management at Mt. Buko

J. Yamatomi, T. Sugiyama, Kazunari Mikami, T. Wakisaka, U. Yamaguchi
{"title":"Limestone Mining and Slope Management at Mt. Buko","authors":"J. Yamatomi, T. Sugiyama, Kazunari Mikami, T. Wakisaka, U. Yamaguchi","doi":"10.2473/JOURNALOFMMIJ.134.161","DOIUrl":null,"url":null,"abstract":"the end of March 2017, the 36 years long cooperative operations mined out about 248 million tonnes of limestone. The mechanical behavior of the Mt. Buko ’ s rock slope has been monitored by several kinds of devices and methods since November 1994. In September 2007, a heavy rainfall of a typhoon caused unprecedentedly distinct but short-term movements in some part of the rock slope, which made the three mining companies intensify monitoring and prompt groundwater drainage from the rock slope. In order to reduce permeation of rain into limestone, paving works of roads on the rock slope are being carried out. Moreover, twenty three steel pipes (80 m long × 600 mm in diameter) were piled into the rock slope and retaining rock piles of total weight of some 2.4 million tonnes are being constructed to reinforce the sher resistance of invisible planes of weakness.","PeriodicalId":16502,"journal":{"name":"Journal of Mmij","volume":"89 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2018-11-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Mmij","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2473/JOURNALOFMMIJ.134.161","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

the end of March 2017, the 36 years long cooperative operations mined out about 248 million tonnes of limestone. The mechanical behavior of the Mt. Buko ’ s rock slope has been monitored by several kinds of devices and methods since November 1994. In September 2007, a heavy rainfall of a typhoon caused unprecedentedly distinct but short-term movements in some part of the rock slope, which made the three mining companies intensify monitoring and prompt groundwater drainage from the rock slope. In order to reduce permeation of rain into limestone, paving works of roads on the rock slope are being carried out. Moreover, twenty three steel pipes (80 m long × 600 mm in diameter) were piled into the rock slope and retaining rock piles of total weight of some 2.4 million tonnes are being constructed to reinforce the sher resistance of invisible planes of weakness.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
布哥山石灰石开采及斜坡管理
截至2017年3月底,长达36年的合作作业共开采出石灰石约2.48亿吨。自1994年11月以来,采用多种装置和方法对布哥山岩质边坡的力学行为进行了监测。2007年9月,一场台风带来的强降雨,在岩质边坡的某些部分造成了前所未有的明显但短期的移动,这使得三家矿业公司加强了监测,并迅速从岩质边坡中抽取地下水。为减少雨水渗入石灰岩,现正进行石坡道路铺路工程。此外,23根钢管(长80米,直径600毫米)被灌入岩石边坡,总重量约240万吨的挡土桩正在建造中,以加强无形薄弱面的阻力。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Classification Analysis of Blended Copper Concentrate Tablet Combustion Behavior by High-speed Imaging of Suspended Combustion Test and Convolutional Neural Network 石灰石を多量に使用する素材産業における石灰石の有効性と石灰石添加割合の最適化 キレート樹脂に吸着した3 価金属イオンの脱離挙動と脱離後の吸着挙動: スカンジウムと他の金属イオンとの比較 低グラファイト化度炭素質難処理金鉱石に対するチオ尿素金抽出の優位性 Electroforming Processing for Nano/Micro Fabrication
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1