{"title":"Perencanaan Jadwal Waktu Proyek Modular House Two Storey Menggunakan Pendekatan Critical Path Method di PT XYZ","authors":"Robby Rahmansah, Verani Hartati","doi":"10.24014/jti.v8i2.17998","DOIUrl":null,"url":null,"abstract":"PT XYZ is a company engaged in the design of houses with simple, practical, and efficient design. The company makes various types and sizes of modular house buildings that can be combined and combined into a house with the type or size you want. One of its products is a modular house two storey. In the implementation of the construction of the modular house two storey model house, there was a delay in project work for 14 days from the construction target of 75 days. This study aims to determine the critical path, duration of completion and schedule plan for the modular house two storey project. Project schedule planning is carried out using the critical path method (CPM) approach, which includes determining settlements such as dependency activity relationships, CPM networks, forward and backward calculations, critical path calculations","PeriodicalId":32235,"journal":{"name":"Spektrum Industri Jurnal Ilmiah Pengetahuan dan Penerapan Teknik Industri","volume":"8 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-12-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Spektrum Industri Jurnal Ilmiah Pengetahuan dan Penerapan Teknik Industri","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.24014/jti.v8i2.17998","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1
Abstract
PT XYZ is a company engaged in the design of houses with simple, practical, and efficient design. The company makes various types and sizes of modular house buildings that can be combined and combined into a house with the type or size you want. One of its products is a modular house two storey. In the implementation of the construction of the modular house two storey model house, there was a delay in project work for 14 days from the construction target of 75 days. This study aims to determine the critical path, duration of completion and schedule plan for the modular house two storey project. Project schedule planning is carried out using the critical path method (CPM) approach, which includes determining settlements such as dependency activity relationships, CPM networks, forward and backward calculations, critical path calculations