Technical and Economical Substantiation of the Technology of Joint Pyrometallurgical Processing of Oxidized Nickel Ores and Sulfide Copper Ores

Alexander M. Klyushnikov, Evgeny N. Selivanov
{"title":"Technical and Economical Substantiation of the Technology of Joint Pyrometallurgical Processing of Oxidized Nickel Ores and Sulfide Copper Ores","authors":"Alexander M. Klyushnikov, Evgeny N. Selivanov","doi":"10.18502/kms.v6i1.8036","DOIUrl":null,"url":null,"abstract":"The technological scheme of processing of nickel and copper ores from the Urals deposits is substantiated, including calcination of oxidized nickel ore with limestone, partial oxidative roasting of sulfide copper ore, blending of calcines with coke, and melting of charge to obtain copper-nickel matte. The implementation of the scheme will increase the complexity of possible uses of raw materials and ensure a high environmental protection level. A feasibility study was carried out for the organization of industrial enterprise, which entailed the joint processing of oxidized nickel ores and sulfide copper ores with a capacity of 700,000 tons per year of a mixture of initial ores, including 400,000 tonnes of nickel ore and 300,000 tonnes of copper ore (dry weight). Finished products are: copper-nickel matte, containing not less than, wt.%: 3.3 Cu, 4.7 Ni, 0.6 Co, 1.5 g/t Au, 2.6 g/t Ag; granular slag containing, wt.%: 0.01–0.02 Ni, 0.01–0.02 Cu, 0.01–0.06 Co, 13–16 Fe, 44–50 SiO2, 13–14 MgO, 4–5 Al 2O3, 9–11 CaO; and technical grade sulfuric acid (mass fraction of monohydrate not less than 92.5 %). The planned enterprise is expected to produce the following annual volumes of finished products (not less than): 94,900 tonnes of matte; 512,300 tonnes of granular slag; and 235,500 tonnes of technical grade sulfuric acid. The estimated period of project implementation is 13 years. The total amount of investment costs is 1407 million roubles, current costs for the annual production program are 3820 million roubles. The financial results of the investment project are characterized by the following indicators: net profit is 5,735.5 million roubles, net discounted income is 1546.6 million roubles, the profitability index of discounted investments is 2.1, the internal rate of return is 36.4 %, and the discounted payback period is 5.5 years. The results indicate the viability and economic efficiency of the project. \nKeywords: ore, processing, sulfides, oxides, copper, nickel, cobalt, smelting, extraction, products, economy, indicators, efficiency","PeriodicalId":17908,"journal":{"name":"KnE Materials Science","volume":"1 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2020-12-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"KnE Materials Science","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.18502/kms.v6i1.8036","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The technological scheme of processing of nickel and copper ores from the Urals deposits is substantiated, including calcination of oxidized nickel ore with limestone, partial oxidative roasting of sulfide copper ore, blending of calcines with coke, and melting of charge to obtain copper-nickel matte. The implementation of the scheme will increase the complexity of possible uses of raw materials and ensure a high environmental protection level. A feasibility study was carried out for the organization of industrial enterprise, which entailed the joint processing of oxidized nickel ores and sulfide copper ores with a capacity of 700,000 tons per year of a mixture of initial ores, including 400,000 tonnes of nickel ore and 300,000 tonnes of copper ore (dry weight). Finished products are: copper-nickel matte, containing not less than, wt.%: 3.3 Cu, 4.7 Ni, 0.6 Co, 1.5 g/t Au, 2.6 g/t Ag; granular slag containing, wt.%: 0.01–0.02 Ni, 0.01–0.02 Cu, 0.01–0.06 Co, 13–16 Fe, 44–50 SiO2, 13–14 MgO, 4–5 Al 2O3, 9–11 CaO; and technical grade sulfuric acid (mass fraction of monohydrate not less than 92.5 %). The planned enterprise is expected to produce the following annual volumes of finished products (not less than): 94,900 tonnes of matte; 512,300 tonnes of granular slag; and 235,500 tonnes of technical grade sulfuric acid. The estimated period of project implementation is 13 years. The total amount of investment costs is 1407 million roubles, current costs for the annual production program are 3820 million roubles. The financial results of the investment project are characterized by the following indicators: net profit is 5,735.5 million roubles, net discounted income is 1546.6 million roubles, the profitability index of discounted investments is 2.1, the internal rate of return is 36.4 %, and the discounted payback period is 5.5 years. The results indicate the viability and economic efficiency of the project. Keywords: ore, processing, sulfides, oxides, copper, nickel, cobalt, smelting, extraction, products, economy, indicators, efficiency
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
氧化镍矿与硫化铜矿联合热冶工艺的技术经济论证
提出了乌拉尔矿床镍铜矿石的工艺方案,即氧化镍矿石用石灰石煅烧、硫化铜矿石部分氧化焙烧、煅烧剂与焦炭混配、炉料熔炼得到铜镍锍。该方案的实施将增加原材料可能用途的复杂性,并确保高环保水平。为组织工业企业进行了可行性研究,其中包括联合加工氧化镍矿石和硫化铜矿石,其初始矿石的混合能力为每年70万吨,其中包括40万吨镍矿石和30万吨铜矿石(干重)。成品为:铜镍哑光,含铜量不低于,wt %: 3.3 Cu, 4.7 Ni, 0.6 Co, 1.5 g/t Au, 2.6 g/t Ag;颗粒渣含镍0.01 ~ 0.02,Cu 0.01 ~ 0.02, Co 0.01 ~ 0.06, Fe 13 ~ 16, SiO2 44 ~ 50, MgO 13 ~ 14, Al ~ 5 ~ 2O3, CaO 9 ~ 11;工业级硫酸(一水质量分数不低于92.5%)。计划中的企业预计每年生产以下成品(不少于):94,900吨哑光;粒状矿渣512,300吨;23.55万吨工业级硫酸。预计项目实施周期为13年。投资成本总额为1407亿卢布,年度生产计划的当前成本为3820亿卢布。该投资项目的财务结果具有以下指标的特征:净利润为57.355亿卢布,净折现收益为15466万卢布,折现投资盈利指数为2.1,内部收益率为36.4%,折现回收期为5.5年。结果表明,该方案具有可行性和经济效益。关键词:矿石,加工,硫化物,氧化物,铜,镍,钴,冶炼,提取,产品,经济,指标,效率
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
E. Globulus Vessel and Fibre Chemical Analysis Phytoremediation of Boron From Wastewater in Vertical Flow Constructed Wetlands Water Reuse in a Municipal Sports Center Water Reuse: A Risk Assessment Model for Water Resources Influence of Hydraulic Conditions on Reclaimed Water Polishing Using Soil and Sand Columns
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1