Optimization of Gigabit Passive Optical Network (GPON) Devices Replacement Interval

Muhammad Mahrus Syamsurrijal, Abdullah Shahab
{"title":"Optimization of Gigabit Passive Optical Network (GPON) Devices Replacement Interval","authors":"Muhammad Mahrus Syamsurrijal, Abdullah Shahab","doi":"10.12962/j23546026.y2020i1.11948","DOIUrl":null,"url":null,"abstract":"Entering the industrial era that is increasingly advanced and growing, reliable internet connection becomes a very important foundation for every business. Internet connection failure or downtime will be the obstacle and causes much loss both for businessman and for internet provider company. This research aims to find a solution on how to minimize internet connection failure. One of the various methods that can be used to overcome the problem is called preventive maintenance. This research is chosen to determine how far the role of preventive maintenance in reducing the risk of connection failure due to device failure. Several tools that used in this research, such as statistical distribution to determine the pattern of device failure, and mathematical formula to calculate the estimated duration of the downtime occurs based on the time of preventive maintenance was applied. From that calculation, it can be concluded the optimal time to apply preventive maintenance to minimize downtime duration. The results reveal that a decreasing downtime value happens when preventive maintenance is applied at the optimal age of the device. EI8E 8FE Electrical Interface Card kit was reduced by 8.01% with an optimal age of 21.82 days. GTGH 16 Port GPON Line Card devices were reduced by 5.46% with an optimal age of 16.69 days. EMTPDP-DC Power Board devices are reduced by 0.1% with an optimal age of 53 days. The GPON MSVG Control & Switching Card device is reduced by 4.38% with an optimal age of 32.28 days. MTPD Power Supply equipment is reduced by 1.2% with an optimal age of 92.35 days. The ETC8B 8E1 / T1 CES Card device was reduced by 0.84% with an optimal age of 41.23 days. Keywords―Data Processin, Downtime, Internet, Preventive Maintenance.","PeriodicalId":14533,"journal":{"name":"IPTEK Journal of Proceedings Series","volume":"43 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-01-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"IPTEK Journal of Proceedings Series","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.12962/j23546026.y2020i1.11948","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Entering the industrial era that is increasingly advanced and growing, reliable internet connection becomes a very important foundation for every business. Internet connection failure or downtime will be the obstacle and causes much loss both for businessman and for internet provider company. This research aims to find a solution on how to minimize internet connection failure. One of the various methods that can be used to overcome the problem is called preventive maintenance. This research is chosen to determine how far the role of preventive maintenance in reducing the risk of connection failure due to device failure. Several tools that used in this research, such as statistical distribution to determine the pattern of device failure, and mathematical formula to calculate the estimated duration of the downtime occurs based on the time of preventive maintenance was applied. From that calculation, it can be concluded the optimal time to apply preventive maintenance to minimize downtime duration. The results reveal that a decreasing downtime value happens when preventive maintenance is applied at the optimal age of the device. EI8E 8FE Electrical Interface Card kit was reduced by 8.01% with an optimal age of 21.82 days. GTGH 16 Port GPON Line Card devices were reduced by 5.46% with an optimal age of 16.69 days. EMTPDP-DC Power Board devices are reduced by 0.1% with an optimal age of 53 days. The GPON MSVG Control & Switching Card device is reduced by 4.38% with an optimal age of 32.28 days. MTPD Power Supply equipment is reduced by 1.2% with an optimal age of 92.35 days. The ETC8B 8E1 / T1 CES Card device was reduced by 0.84% with an optimal age of 41.23 days. Keywords―Data Processin, Downtime, Internet, Preventive Maintenance.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
千兆无源光网络(GPON)设备更换周期的优化
进入日益先进和发展的工业时代,可靠的互联网连接成为每一个企业非常重要的基础。互联网连接故障或停机将是一个障碍,并给商人和互联网提供商公司造成很大的损失。本研究旨在寻找一种解决方案,以尽量减少网络连接故障。可以用来克服问题的各种方法之一被称为预防性维护。选择这项研究是为了确定预防性维护在减少设备故障引起的连接故障风险方面的作用。本研究中使用的几种工具,如用于确定设备故障模式的统计分布,以及基于预防性维护时间计算预计停机时间的数学公式。从该计算中,可以得出应用预防性维护以最小化停机时间的最佳时间。结果表明,在设备的最佳使用年限进行预防性维护时,停机时间值会减少。ei8e8fe电接口卡套装减少8.01%,最佳龄21.82 d。GTGH 16端口GPON Line Card设备减少5.46%,最佳使用年龄为16.69天。EMTPDP-DC电源板器件减少0.1%,最佳使用寿命为53天。GPON MSVG控制开关卡设备减少4.38%,最佳使用年龄为32.28天。MTPD供电设备减少1.2%,最佳使用年限为92.35天。ETC8B 8E1 / T1 CES卡装置减少0.84%,最佳年龄为41.23 d。关键词:数据处理,停机时间,互联网,预防性维护
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Increasing The Quality and Quantity of Marine Processed Production in Fisherman Villages Assistance of Handicraft Small Business in Increasing Capacity Greenhouse Potential based on Ecotourism and Education for Sustainable Village Economic Resilience Developing New Indonesia Circular Economy Indicators: A Lesson Learnt from European Union A Review of Circular Economy Index from Many Perspective
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1