Alper Çetin, Caner Ozen, A. Bayatmakoo, Kerim Kaya, Gokturk Poyrazoglu
{"title":"A Pilot Project for Power Quality Improvements in Distribution System by a Li-ion Battery","authors":"Alper Çetin, Caner Ozen, A. Bayatmakoo, Kerim Kaya, Gokturk Poyrazoglu","doi":"10.1109/SGRE53517.2022.9774167","DOIUrl":null,"url":null,"abstract":"Power quality (PQ) metrics deterioration occurs in the distribution system by increasing the distributed generation plants, the existence of non-linear and harmonic loads. As a distribution system operator running under the Turkishelectricity regulation, a battery investment was made to improve PQ metrics to provide quality electricity service to customers by focusing on Volt/VAr optimization to obtain voltage stability parameters. The reverse power flow caused by the distributed generation can be eliminated and the power factor would be improved with the reactive support with this investment. This study includes the reasons for the battery pilot project, the engineering methodology, and post-solution improvements.","PeriodicalId":64562,"journal":{"name":"智能电网与可再生能源(英文)","volume":"144 1","pages":"1-5"},"PeriodicalIF":0.0000,"publicationDate":"2022-03-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"智能电网与可再生能源(英文)","FirstCategoryId":"1087","ListUrlMain":"https://doi.org/10.1109/SGRE53517.2022.9774167","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3
Abstract
Power quality (PQ) metrics deterioration occurs in the distribution system by increasing the distributed generation plants, the existence of non-linear and harmonic loads. As a distribution system operator running under the Turkishelectricity regulation, a battery investment was made to improve PQ metrics to provide quality electricity service to customers by focusing on Volt/VAr optimization to obtain voltage stability parameters. The reverse power flow caused by the distributed generation can be eliminated and the power factor would be improved with the reactive support with this investment. This study includes the reasons for the battery pilot project, the engineering methodology, and post-solution improvements.