M. Nan, Dorina Bădiță Popescu, D. Grecea, Cosmin Vitan, Bogdan Brănișteanu
{"title":"Research on Construction and Sizing of the Metal Structure of a Winding Installation","authors":"M. Nan, Dorina Bădiță Popescu, D. Grecea, Cosmin Vitan, Bogdan Brănișteanu","doi":"10.35219/mms.2021.2.02","DOIUrl":null,"url":null,"abstract":"The paper focuses on the design of the metal tower for the sinking of Netiș de-ventilating shaft in Râul Mare Retezat hydro-energetic setup. The analytical calculation of sizing and verification of the metal structure is doubled by the graphic simulation with speciality software, in view of obtaining results as close as possible to the real exploitation conditions of the tower. The tower of the de-ventilating shaft is considered to be a temporary construction, and its component parts will be decommissioned once the sinking is finalized. The tower is made up of metal structures in four transoms, 3 being mounted with junction plates and screws, the fourth being the roof.","PeriodicalId":22358,"journal":{"name":"The Annals of “Dunarea de Jos” University of Galati. Fascicle IX, Metallurgy and Materials Science","volume":"476 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2021-06-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"The Annals of “Dunarea de Jos” University of Galati. Fascicle IX, Metallurgy and Materials Science","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.35219/mms.2021.2.02","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
The paper focuses on the design of the metal tower for the sinking of Netiș de-ventilating shaft in Râul Mare Retezat hydro-energetic setup. The analytical calculation of sizing and verification of the metal structure is doubled by the graphic simulation with speciality software, in view of obtaining results as close as possible to the real exploitation conditions of the tower. The tower of the de-ventilating shaft is considered to be a temporary construction, and its component parts will be decommissioned once the sinking is finalized. The tower is made up of metal structures in four transoms, 3 being mounted with junction plates and screws, the fourth being the roof.
本文主要介绍了 ul - Mare - Retezat水力发电装置netipro通风竖井下沉金属塔的设计。为了使结果尽可能接近塔的实际开发情况,利用专业软件进行图形模拟,对金属结构的尺寸进行了解析计算和校核。排风竖井塔为临时建筑,一旦完成下沉,其组成部分将退役。塔楼由四个横梁的金属结构组成,其中三个横梁用连接板和螺钉安装,第四个横梁是屋顶。