Streamlining the Well Location Optimization Process - An Automated Approach Applied to a Large Onshore Carbonate Field

Bruno D. Roussennac, G. V. van Essen, B.-R. de Zwart, Claus von Winterfeld, E. Hernandez, Rob Harris, N. Al Sultan, B. Al Otaibi, A. Kidd, G. Kostin
{"title":"Streamlining the Well Location Optimization Process - An Automated Approach Applied to a Large Onshore Carbonate Field","authors":"Bruno D. Roussennac, G. V. van Essen, B.-R. de Zwart, Claus von Winterfeld, E. Hernandez, Rob Harris, N. Al Sultan, B. Al Otaibi, A. Kidd, G. Kostin","doi":"10.2118/205913-ms","DOIUrl":null,"url":null,"abstract":"\n Infill drilling is a proved strategy to improve hydrocarbon recovery from reservoirs to increase production and maximize field value. Infill drilling projects address the following questions: 1) Where should the wells be drilled? 2) What should be their optimum trajectories? 3) What are the realistic ranges of incremental production of the infill wells? Answering these questions is important yet challenging as it requires the evaluation of multiple scenarios which is laborious and time intensive.\n This study presents an integrated workflow that allows the optimization of drilling locations using an automated approach that comprises cutting-edge optimization algorithms coupled to reservoir simulation. This workflow concurrently evaluates multiple scenarios until they are narrowed down to an optimum range according to pre-set objectives and honoring pre-established well design constraints. The simultaneous nature of the workflow makes it possible to differentiate between acceleration and real incremental recovery linked to proposed locations. In addition, the technology enables the optimization of all the elements that are relevant to the selection of drilling candidates, such as location, trajectory, inclination, and perforation interval.\n The well location optimization workflow was applied to a real carbonate large field; heavily faulted; with a well count of +400 active wells and subject to waterflooding. Hence the need for an automated way of finding new optimal drilling locations enabling testing of many locations. Also due to the significant full field model size; sector modelling capability was used such that the optimization, i.e. running many scenarios; could be carried out across smaller scale models within a reasonable time frame. Using powerful hardware and a fully parallelized simulation engine were also important elements in allowing the efficient evaluation of ranges of possible solutions while getting deeper insights into the field and wells responses. As a result of the study, 8 out of the original 9 well locations were moved to more optimal locations. The proposed optimized locations generate an incremental oil recovery increase of more than 70% compared to the original location (pre-optimization). In addition, the project was completed within 2 weeks of equivalent computational time which is a significant acceleration compared to a manual approach of running optimization on a full field model and it is significantly more straight forward than the conventional location selection process.\n The novelty of the project is introduced by customized python scripts. These scripts allow to achieve practical ways for placing the well locations to explore the solution space and at the same time, honor well design constraints, such as maximum well length, maximum step-out from the surface well-pad, and well perforation interval. Such in-built flexibility combined with automation and highly advanced optimization algorithms helped to achieve the project goals much easier and faster.","PeriodicalId":10965,"journal":{"name":"Day 3 Thu, September 23, 2021","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2021-09-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 3 Thu, September 23, 2021","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/205913-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Infill drilling is a proved strategy to improve hydrocarbon recovery from reservoirs to increase production and maximize field value. Infill drilling projects address the following questions: 1) Where should the wells be drilled? 2) What should be their optimum trajectories? 3) What are the realistic ranges of incremental production of the infill wells? Answering these questions is important yet challenging as it requires the evaluation of multiple scenarios which is laborious and time intensive. This study presents an integrated workflow that allows the optimization of drilling locations using an automated approach that comprises cutting-edge optimization algorithms coupled to reservoir simulation. This workflow concurrently evaluates multiple scenarios until they are narrowed down to an optimum range according to pre-set objectives and honoring pre-established well design constraints. The simultaneous nature of the workflow makes it possible to differentiate between acceleration and real incremental recovery linked to proposed locations. In addition, the technology enables the optimization of all the elements that are relevant to the selection of drilling candidates, such as location, trajectory, inclination, and perforation interval. The well location optimization workflow was applied to a real carbonate large field; heavily faulted; with a well count of +400 active wells and subject to waterflooding. Hence the need for an automated way of finding new optimal drilling locations enabling testing of many locations. Also due to the significant full field model size; sector modelling capability was used such that the optimization, i.e. running many scenarios; could be carried out across smaller scale models within a reasonable time frame. Using powerful hardware and a fully parallelized simulation engine were also important elements in allowing the efficient evaluation of ranges of possible solutions while getting deeper insights into the field and wells responses. As a result of the study, 8 out of the original 9 well locations were moved to more optimal locations. The proposed optimized locations generate an incremental oil recovery increase of more than 70% compared to the original location (pre-optimization). In addition, the project was completed within 2 weeks of equivalent computational time which is a significant acceleration compared to a manual approach of running optimization on a full field model and it is significantly more straight forward than the conventional location selection process. The novelty of the project is introduced by customized python scripts. These scripts allow to achieve practical ways for placing the well locations to explore the solution space and at the same time, honor well design constraints, such as maximum well length, maximum step-out from the surface well-pad, and well perforation interval. Such in-built flexibility combined with automation and highly advanced optimization algorithms helped to achieve the project goals much easier and faster.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
简化井位优化过程——一种应用于大型陆上碳酸盐岩油田的自动化方法
在提高油藏油气采收率、提高产量、实现油田价值最大化方面,钻孔是一种行之有效的策略。填充钻井项目解决了以下问题:1)应该在哪里钻井?它们的最佳轨迹应该是什么?3)该井的实际增产范围是什么?回答这些问题很重要,但也很有挑战性,因为它需要对多个场景进行评估,这既费力又耗时。该研究提出了一个集成的工作流程,可以使用自动化方法优化钻井位置,该方法包括尖端的优化算法和油藏模拟。该工作流程可以同时评估多种方案,直到根据预先设定的目标缩小到最佳范围,并遵守预先建立的井设计约束。工作流程的同时性使得区分与建议位置相关的加速和实际增量恢复成为可能。此外,该技术还可以优化与候选钻井选择相关的所有元素,如位置、轨迹、倾角和射孔间隔。将该井位优化工作流程应用于某实际碳酸盐岩大油田;严重断裂;井数为+400口活动井,可进行注水。因此,需要一种自动化的方法来寻找新的最佳钻井位置,从而可以对许多位置进行测试。也由于显著的全场模型尺寸;扇区建模功能被用来进行优化,即运行多个场景;可以在合理的时间范围内进行小规模的模型试验。使用强大的硬件和完全并行化的模拟引擎也是有效评估可能解决方案范围的重要因素,同时可以更深入地了解油田和井的响应。研究的结果是,原来的9口井中有8口被移到了更优的位置。与原始位置(优化前)相比,提出的优化位置的产油量增加了70%以上。此外,该项目在2周的等效计算时间内完成,与在全油田模型上进行手动优化的方法相比,这是一个显着的加速,并且比传统的位置选择过程更直接。这个项目的新奇之处是由定制的python脚本引入的。这些脚本可以实现实用的方法来放置井的位置,以探索解决方案空间,同时遵守井的设计约束,如最大井长、从地面井垫的最大步距和井的射孔间隔。这种内置的灵活性与自动化和高度先进的优化算法相结合,有助于更容易、更快地实现项目目标。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Incorporation of Neutrally Buoyant Proppants in Horizontal Unconventional Wells to Increase Propped Fracture Area Results for Substantially Improved Well Productivity and Economics Simplified Solution for Managed Pressure Drilling - System that Drillers Can Operate The Case for Combining Well Intervention Solutions to Optimize Production and Reduce Risk Exposure Application of Digital Well Construction Planning Tool During Well Conceptualization Phase Downhole Heating Technology – New Solution for Paraffinic Wells
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1