Prospects of model predictive control of the drum level at a 225 MW combined cycle power plant

H. Nieto-Chaupis
{"title":"Prospects of model predictive control of the drum level at a 225 MW combined cycle power plant","authors":"H. Nieto-Chaupis","doi":"10.1109/ETCM.2016.7750860","DOIUrl":null,"url":null,"abstract":"We report the application of the Model-based Predictive Control (MPC) to improve the performance of the start-up of a 150⊕75 MW combined cycle power plant whose gas turbine is fueled by natural gas. In concrete the simulations have shown that the efficient drum level control is reflected on the improvement of power efficiency in the sense of reaching the 225 MW set point in around 45 minutes faster than the case of PID. Experimental data taken from ordinary runs from power plant was used for ends of system identification which is based on convolution integrals resulting well adjustable to the acquired data. Simulations have demonstrated that the performance of the MPC surpasses to the one of classic PID essentially in two aspects: (i) reducing the time for reaching set point and (ii) avoiding unexpected critical situations during the plant start-up. Results have indicated that the MPC might reduce in up to 45±5 minutes the time of reaching the set point established to be 225MWwithin a computational error of 5%, which is translated as the MPC error of order of 2.5% working as software in plant. All these results might sustain the fact that the MPC based on convolution models appears to be an interesting scheme to optimize the full functionality in power plants whose expected power is ranging between 200 and 250 MW.","PeriodicalId":6480,"journal":{"name":"2016 IEEE Ecuador Technical Chapters Meeting (ETCM)","volume":"13 1","pages":"1-5"},"PeriodicalIF":0.0000,"publicationDate":"2016-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2016 IEEE Ecuador Technical Chapters Meeting (ETCM)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ETCM.2016.7750860","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

Abstract

We report the application of the Model-based Predictive Control (MPC) to improve the performance of the start-up of a 150⊕75 MW combined cycle power plant whose gas turbine is fueled by natural gas. In concrete the simulations have shown that the efficient drum level control is reflected on the improvement of power efficiency in the sense of reaching the 225 MW set point in around 45 minutes faster than the case of PID. Experimental data taken from ordinary runs from power plant was used for ends of system identification which is based on convolution integrals resulting well adjustable to the acquired data. Simulations have demonstrated that the performance of the MPC surpasses to the one of classic PID essentially in two aspects: (i) reducing the time for reaching set point and (ii) avoiding unexpected critical situations during the plant start-up. Results have indicated that the MPC might reduce in up to 45±5 minutes the time of reaching the set point established to be 225MWwithin a computational error of 5%, which is translated as the MPC error of order of 2.5% working as software in plant. All these results might sustain the fact that the MPC based on convolution models appears to be an interesting scheme to optimize the full functionality in power plants whose expected power is ranging between 200 and 250 MW.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
225mw联合循环电厂汽包水位模型预测控制展望
本文报道了基于模型的预测控制(MPC)在150⊕75 MW燃气轮机天然气燃料联合循环电厂启动性能改进中的应用。具体而言,仿真结果表明,高效的汽包液位控制体现在功率效率的提高上,比PID控制在45分钟左右达到225mw设定点。利用电厂正常运行的实验数据进行系统辨识,该方法基于卷积积分,对采集到的数据进行了较好的调整。仿真结果表明,MPC的性能优于经典PID的主要表现在两个方面:(1)缩短了达到设定值的时间;(2)避免了装置启动过程中出现的意外关键情况。结果表明,MPC可以在5%的计算误差范围内,在45±5分钟内达到设定的225mw的时间,这相当于在工厂中作为软件工作的MPC误差为2.5%。所有这些结果可能支持这样一个事实,即基于卷积模型的MPC似乎是一个有趣的方案,以优化电厂的全部功能,其预期功率范围在200至250兆瓦之间。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Development of a smart glove as a communication tool for people with hearing impairment and speech disorders Algorithm and rapid intervention to attenuate Zika virus outbreak in large cities EMR system synchronization Trajectory tracking for quadcopter's formation with two control strategies Performance evaluation of radar systems in noise jamming environments
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1