KOORDINASI SISTEM PROTEKSI TRAFO DISTRIBUSI 20 KV (STUDI LAPANGAN PT. PLN PERSERO UNIT LAMONGAN)

Rohmat Syaifuddin, Z. Abidin, Affan Bachri
{"title":"KOORDINASI SISTEM PROTEKSI TRAFO DISTRIBUSI 20 KV (STUDI LAPANGAN PT. PLN PERSERO UNIT LAMONGAN)","authors":"Rohmat Syaifuddin, Z. Abidin, Affan Bachri","doi":"10.30736/JT.V12I1.400","DOIUrl":null,"url":null,"abstract":"Electricity distribution systems that use aerial or ground wires often experience various disturbances. Disturbances that often occur are symmetry disturbances or asymmetric disturbances which can be in the form of a short circuit of one phase to the ground, between phases or the breakup of one or more. To determine the magnitude of the fault current is needed transformer distribution system analysis to determine the disturbances that will occur. The transformer which is the main equipment in a GI must be considered to get the right current and safety circuit. Designing an appropriate transformer setting is an effort to protect equipment, systems and consumer needs from interference that may occur in the distribution system. Calculation of the fault current and the magnitude of the transformer nominal current will be used as an important reference in determining the transformer setting in the distribution of voltage to consumers. From the results of these calculations, it can be concluded that the relay feeder performance time is slower than the relay time in the calculation. The data in the field is still in a suitable condition (the difference is not too far away), so that the overall OCR - GFR settings in the field are still in good condition.","PeriodicalId":17707,"journal":{"name":"Jurnal Qua Teknika","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2020-03-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Qua Teknika","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.30736/JT.V12I1.400","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Electricity distribution systems that use aerial or ground wires often experience various disturbances. Disturbances that often occur are symmetry disturbances or asymmetric disturbances which can be in the form of a short circuit of one phase to the ground, between phases or the breakup of one or more. To determine the magnitude of the fault current is needed transformer distribution system analysis to determine the disturbances that will occur. The transformer which is the main equipment in a GI must be considered to get the right current and safety circuit. Designing an appropriate transformer setting is an effort to protect equipment, systems and consumer needs from interference that may occur in the distribution system. Calculation of the fault current and the magnitude of the transformer nominal current will be used as an important reference in determining the transformer setting in the distribution of voltage to consumers. From the results of these calculations, it can be concluded that the relay feeder performance time is slower than the relay time in the calculation. The data in the field is still in a suitable condition (the difference is not too far away), so that the overall OCR - GFR settings in the field are still in good condition.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
协调协调传输传输系统20 KV (PT. PLN PERSERO单位实地研究)
使用架空或地线的配电系统经常受到各种干扰。经常发生的干扰是对称干扰或非对称干扰,其形式可以是一相到地的短路、两相之间的短路或一个或多个相的断开。要确定故障电流的大小,需要对变压器配电系统进行分析,以确定将会发生的扰动。变压器是整流器中的主要设备,必须考虑变压器是否能获得正确的电流和安全电路。设计适当的变压器设置是为了保护设备、系统和用户需求免受配电系统中可能发生的干扰。故障电流的计算和变压器标称电流的大小将作为确定变压器在向用户分配电压时设置的重要参考。从这些计算结果可以得出,继电器馈线性能时间比计算中的继电器时间慢。现场的数据仍然处于合适的状态(差异不会太远),因此现场的整体OCR - GFR设置仍然处于良好状态。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
PEMILIHAN SUPPLIER MINYAK JELANTAH BAHAN BAKU BIOSOLAR DENGAN METODE ELECTRE SISTEM PENDUKUNG KEPUTUSAN PENERIMA PKH MENGGUNAKAN METODE SAW KAJIAN ENERGI SPESIFIK PADA BENDUNG BERTANGGA DENGAN VARIASI KEMIRINGAN HULU PADA SALURAN PERSEGI ALAT PROYEK MIKRO KONTROL PENGHAPUS PAPAN TULIS OTOMATIS MENGGUNAKAN REMOTE BERBASIS ARDUINO Prefix SISTEM PENGISIAN AIR PADA TANKI PEMBUATAN ROTI DENGAN METODE FUZZY LOGIC MENGGUNAKAN ARDUINO
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1