{"title":"Ready, Set, Launch","authors":"M. Furrer, G. Hasbrouck, Jack Yuzna","doi":"10.1061/CIEGAG.0001289","DOIUrl":null,"url":null,"abstract":"The replacement of a Warren through-truss bridge with a new structure similar in appearance over a very busy, 23-track rail yard in Minneapolis required prefabrication of steel trusses and an innovative launching method.","PeriodicalId":50692,"journal":{"name":"Civil Engineering","volume":"105 1","pages":"70-75"},"PeriodicalIF":1.4000,"publicationDate":"2018-05-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Civil Engineering","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.1061/CIEGAG.0001289","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"ENGINEERING, CIVIL","Score":null,"Total":0}
引用次数: 0
Abstract
The replacement of a Warren through-truss bridge with a new structure similar in appearance over a very busy, 23-track rail yard in Minneapolis required prefabrication of steel trusses and an innovative launching method.
期刊介绍:
Reaching an audience of more than 140,000 civil engineers worldwide, the magazine has the largest circulation within the engineering profession, providing a compelling editorial mix of: -Projects- Trends- Engineering Science- Engineering Technology- Engineering History- In-Depth Analysis of Current Issues- Public Policy- Law- Ethics.