Why are the Frequently Reported Delay Factors in Construction Projects Recurring?: A Qualitative Study

Jeonghyun Kim, Pilar Bilbao
{"title":"Why are the Frequently Reported Delay Factors in Construction Projects Recurring?: A Qualitative Study","authors":"Jeonghyun Kim, Pilar Bilbao","doi":"10.30880/ijscet.2023.14.01.003","DOIUrl":null,"url":null,"abstract":"Since a construction project involves a huge amount of resources, delays in construction have an unfavorable impact on all stakeholders. Due to the large-scale, specialization, and complexity of construction projects, construction delaysare reported globally. Previous quantitative studies mainly through questionnaires have focused on identifying delay factors. However, the identified delay factors show little difference regardless of time and region, thus, a more fundamental study on theroot causes of the delay is needed. Therefore, this study intends to discuss in depth the causes of delay factors identified in previous studies from professionals’ point of view. According to the interview with the experts, schedule delays are caused by factors such as short initial construction periods, errors in design documents, and rework. The effect of construction delays includes not only work quality degradation and increased risk of workplace accidents, but also the professional ethical dilemma ofmanagers. The experts mention that the construction delay can be alleviated with basic measures such as estimating spare construction period, reviewing design documents before work, and thorough quality control. This paper helps in understanding of the identified construction delays and can provide valuable insights in formulating effective strategies to avoid delays in construction projects.","PeriodicalId":14418,"journal":{"name":"International Journal of Sustainable Construction Engineering and Technology","volume":"18 1","pages":""},"PeriodicalIF":0.6000,"publicationDate":"2023-02-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Sustainable Construction Engineering and Technology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.30880/ijscet.2023.14.01.003","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"CONSTRUCTION & BUILDING TECHNOLOGY","Score":null,"Total":0}
引用次数: 0

Abstract

Since a construction project involves a huge amount of resources, delays in construction have an unfavorable impact on all stakeholders. Due to the large-scale, specialization, and complexity of construction projects, construction delaysare reported globally. Previous quantitative studies mainly through questionnaires have focused on identifying delay factors. However, the identified delay factors show little difference regardless of time and region, thus, a more fundamental study on theroot causes of the delay is needed. Therefore, this study intends to discuss in depth the causes of delay factors identified in previous studies from professionals’ point of view. According to the interview with the experts, schedule delays are caused by factors such as short initial construction periods, errors in design documents, and rework. The effect of construction delays includes not only work quality degradation and increased risk of workplace accidents, but also the professional ethical dilemma ofmanagers. The experts mention that the construction delay can be alleviated with basic measures such as estimating spare construction period, reviewing design documents before work, and thorough quality control. This paper helps in understanding of the identified construction delays and can provide valuable insights in formulating effective strategies to avoid delays in construction projects.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
为什么经常报告的建设项目延误因素会反复出现?:一项定性研究
由于建设项目涉及大量资源,施工延误对所有利益相关者都有不利影响。由于建设项目的大规模、专业化和复杂性,施工延误在全球范围内都有报道。以往的定量研究主要是通过问卷调查来确定延迟因素。然而,所识别的延迟因素在不同的时间和地区差异不大,因此需要对延迟的根本原因进行更基础的研究。因此,本研究拟从专业人士的角度,深入探讨前人研究中发现的延迟因素的成因。根据对专家的采访,进度延迟是由初始施工周期短、设计文件错误、返工等因素造成的。施工延误的影响不仅包括工程质量的下降和工作场所事故风险的增加,还包括管理人员的职业道德困境。专家们指出,通过估算剩余工期、开工前审查设计文件、彻底控制质量等基本措施,可以缓解施工延误。本文有助于理解已识别的施工延误,并为制定有效的策略以避免施工项目延误提供有价值的见解。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
CiteScore
0.90
自引率
20.00%
发文量
25
期刊最新文献
Preferensi Warga Kota Bandar Lampung Terhadap Angkutan Umum Kajian Tekno Ekonomi pada Pembangunan Jalur Ganda Rel Kereta Api Segmen Tanjungkarang-Kotabumi di Provinsi Lampung Studi Manajemen Operasi dan Pemeliharaan Jalan Tol Pekanbaru-Dumai Pengaruh Analisis Arus Kas dalam Proyek Konstruksi: Tinjauan Literatur Sistematis Tinjauan Standar Protokol Kesehatan Penyakit Menular Sektor Konstruksi: Studi Kasus COVID-19
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1