Size of stockpile: An equipment breakdown analysis approach for a case study

Santanu Majumder, Rabi Kishore Mohanty
{"title":"Size of stockpile: An equipment breakdown analysis approach for a case study","authors":"Santanu Majumder,&nbsp;Rabi Kishore Mohanty","doi":"10.1016/0167-9031(91)91537-R","DOIUrl":null,"url":null,"abstract":"<div><p>A case study of an opencast mine is presented where work is being carried out using an interconnected system, with mined ore fed directly to a processing plant. Breakdowns in the mining process or in the plant affect the overall mine production. To separate the two interconnected units, an intermediate stockpile before the primary crusher of the plant has been proposed. The stockpile should be of an adequate capacity to provide the necessary coverage for the breakdowns, but should not be too large or rehandling costs will be too high and it will take up too much space. The minimum size of the stockpile required has been estimated using detailed statistical analysis.</p></div>","PeriodicalId":100929,"journal":{"name":"Mining Science and Technology","volume":"12 1","pages":"Pages 53-66"},"PeriodicalIF":0.0000,"publicationDate":"1991-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1016/0167-9031(91)91537-R","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Mining Science and Technology","FirstCategoryId":"1085","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/016790319191537R","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

A case study of an opencast mine is presented where work is being carried out using an interconnected system, with mined ore fed directly to a processing plant. Breakdowns in the mining process or in the plant affect the overall mine production. To separate the two interconnected units, an intermediate stockpile before the primary crusher of the plant has been proposed. The stockpile should be of an adequate capacity to provide the necessary coverage for the breakdowns, but should not be too large or rehandling costs will be too high and it will take up too much space. The minimum size of the stockpile required has been estimated using detailed statistical analysis.

查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
库存规模:一个案例研究的设备故障分析方法
介绍了一个露天矿的案例研究,其中工作是使用一个相互关联的系统进行的,开采出来的矿石直接送到加工厂。采矿过程中或工厂中的故障会影响整个矿山的生产。为了分离两个相互连接的单元,建议在工厂主破碎机之前设置中间库存。储备应具有足够的能力,为故障提供必要的覆盖,但不应太大,否则再处理费用太高,而且会占用太多空间。使用详细的统计分析估计了所需储存的最低规模。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
The Study of Parameters of Quarry Faces in Muruntau and Myutenbai Open Pits in Case of Applying Major Blasts GEOLOGICAL AND HYDROGEOLOGICAL STRUCTURE OF RIVER BASINS AND SOIL COMPOSITION AS AN IMPORTANT FACTOR IN THE FORMATION OF THE STREAMFLOW OF THE TERRITORY (ON THE EXAMPLE OF THE DEBED RIVER BASIN) UNDERGROUND DEVELOPMENT OF ORE DEPOSITS WITH CONSERVATION OF THE GROUND SURFACE RESEARCH DESIGN LINING FOR UTILITIES TUNNEL IN THE CITY BASED ON STATE OF "LINING-MASSIF SOIL" METHODS OF STUDYING THE STRUCTURE AND PROPERTIES OF MOUNTAIN BREEDS ON SAMPLES (QUICK REVIEW)
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1