Automatic Cost Effective Phase Selector

Ashish Gupta, A. Singh, Gurpreet Singh, Arun Kumar
{"title":"Automatic Cost Effective Phase Selector","authors":"Ashish Gupta, A. Singh, Gurpreet Singh, Arun Kumar","doi":"10.15662/IJAREEIE.2015.0405019","DOIUrl":null,"url":null,"abstract":"Electricity is lifeline of any country and its continuous availability at minimum cost ensure the country’s growth. Reducing the burden over the energy resources leads to the use of alternative sources of energy like Solar, Wind etc. also they are available free of cost. So modern industries and homes, to ensure regular power supply incorporates mainly three sources of energy i.e. Solar, Mains(Utility grid), Diesel generator sets. So an automatic phase selector circuit is required for the switching between these supplies with the Solar having the highest priority followed by Mains for having access of cheapest electricity. The circuit make use of Transformer, Rectifier, Regulator, Comparator and Relays. The switching time is reduced considerably due to the use of high speed electronics devices.","PeriodicalId":13702,"journal":{"name":"International Journal of Advanced Research in Electrical, Electronics and Instrumentation Energy","volume":"2015 1","pages":"3919-3925"},"PeriodicalIF":0.0000,"publicationDate":"2015-07-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Advanced Research in Electrical, Electronics and Instrumentation Energy","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.15662/IJAREEIE.2015.0405019","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 4

Abstract

Electricity is lifeline of any country and its continuous availability at minimum cost ensure the country’s growth. Reducing the burden over the energy resources leads to the use of alternative sources of energy like Solar, Wind etc. also they are available free of cost. So modern industries and homes, to ensure regular power supply incorporates mainly three sources of energy i.e. Solar, Mains(Utility grid), Diesel generator sets. So an automatic phase selector circuit is required for the switching between these supplies with the Solar having the highest priority followed by Mains for having access of cheapest electricity. The circuit make use of Transformer, Rectifier, Regulator, Comparator and Relays. The switching time is reduced considerably due to the use of high speed electronics devices.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
自动成本有效的相位选择器
电力是任何国家的生命线,它以最低的成本持续供应确保了国家的增长。减少能源资源的负担导致使用替代能源,如太阳能,风能等,而且它们是免费的。所以现代工业和家庭,为了确保正常的电力供应,主要包括三种能源,即太阳能,市电(公用电网),柴油发电机组。因此,需要一个自动相位选择电路来在这些电源之间切换,其中太阳能具有最高的优先级,其次是获得最便宜的电力的主电源。该电路由变压器、整流器、稳压器、比较器和继电器组成。由于使用高速电子器件,开关时间大大减少。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Auto Testing of FCPV and ADC Joint AirLeak Detection Using PLC Image Steganography using Variable KeyTechnique for Double Tier Security Freeware Power Generation StructuralImplementation Strategy using Solar Panels inParallel Approach A Review on Parkinson Disease ClassifierUsing Patient Voice Features A New Cascaded 2-Level Inverter basedSTATCOM for High Power Applications
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1