{"title":"The Impact of The Auto-reclose using Leader-Follower Control Scheme on Transmission Power System Stability Enhancement","authors":"Wayan Eka Sastra Wibawa, M. Zainuddin, S. Humena, S. Syafaruddin, S. Manjang","doi":"10.1109/ICHVEPS47643.2019.9011039","DOIUrl":null,"url":null,"abstract":"The self-restoration ability in the power system following a temporary fault has become an attention since its contribution to the power system stability. The aim of this study is to analyze the impact of the auto reclose on the transmission line on a radial network stability by using the leader-follower control scheme. The leader-follower control scheme is used to minimize the outage time and to reduce the stress on one of the circuit breakers due to closing on permanent fault. This study is applied to a case of an electrical transmission system 150 kV in Gorontalo Province, Indonesia. Currently, the power transmission system in Gorontalo Province has not applied an auto reclosing scheme yet. This study is simulated in order to provide a stability assessment of: the rotor angle, rotor speed, active and reactive power in line transmission, current flow in line transmission, the voltage on bus, and the frequency on bus. The result of this study indicates that a significant voltage drop occurs on one of the bus in the network following fault.","PeriodicalId":6677,"journal":{"name":"2019 2nd International Conference on High Voltage Engineering and Power Systems (ICHVEPS)","volume":"103 1","pages":"1-5"},"PeriodicalIF":0.0000,"publicationDate":"2019-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2019 2nd International Conference on High Voltage Engineering and Power Systems (ICHVEPS)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICHVEPS47643.2019.9011039","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

The self-restoration ability in the power system following a temporary fault has become an attention since its contribution to the power system stability. The aim of this study is to analyze the impact of the auto reclose on the transmission line on a radial network stability by using the leader-follower control scheme. The leader-follower control scheme is used to minimize the outage time and to reduce the stress on one of the circuit breakers due to closing on permanent fault. This study is applied to a case of an electrical transmission system 150 kV in Gorontalo Province, Indonesia. Currently, the power transmission system in Gorontalo Province has not applied an auto reclosing scheme yet. This study is simulated in order to provide a stability assessment of: the rotor angle, rotor speed, active and reactive power in line transmission, current flow in line transmission, the voltage on bus, and the frequency on bus. The result of this study indicates that a significant voltage drop occurs on one of the bus in the network following fault.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
引导者-从动器自动合闸对提高输电系统稳定性的影响
电力系统暂态故障后的自恢复能力关系到电力系统的稳定,因此受到人们的关注。本研究的目的是利用引导者-从动者控制方案,分析输电线路自动合闸对径向网络稳定性的影响。采用先导从动控制方案,最大限度地减少停机时间,并减少由于永久故障合闸对断路器的压力。本研究应用于印度尼西亚Gorontalo省150千伏电力传输系统的一个案例。目前,Gorontalo省的输电系统尚未采用自动重合闸方案。为了对转子角度、转子转速、线传有功功率和无功功率、线传电流、母线电压和母线频率的稳定性进行仿真。研究结果表明,故障发生后,网络中有一条母线会出现明显的电压降。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
A Literature Survey of Optimization Technique of Unit Commitment Implementation in Microgrid Electricity System With Renewable Energy Sources Observation of Partial Discharge Waveform of Electrical Treeing in Epoxy Resin with Filler Implementation of Over Current Relays with Non-Cascade Scheme on Medium Voltage Switchgear as Busbar Protection Study Case in PT PLN (Persero) UIT JBB Optimal Capacitor Placement For IEEE 118 Bus System By Using Genetic Algorithm An active clamped two switch flyback Zeta converter with reduced switch voltage stress
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1