Design of high-strength backfill for a drift-and-fill mining method at Olympias Mine, Greece

H. Grobler, Vasileios Chatziefstratiou, Ourania P. Mousli, M. Yumlu
{"title":"Design of high-strength backfill for a drift-and-fill mining method at Olympias Mine, Greece","authors":"H. Grobler, Vasileios Chatziefstratiou, Ourania P. Mousli, M. Yumlu","doi":"10.36487/ACG_REP/1910_28_GROBLER","DOIUrl":null,"url":null,"abstract":"Olympias Mine is operated by Hellas Gold S.A., a subsidiary of Eldorado Gold Corporation. The orebody shape and size are suitable for a drift and fill mining method. The mining sequence is overhand and the demand for backfill strengths are generally low except for the initial sill cuts. The design fill strengths are determined from the planned stope exposures to allow for safe extraction of the ore in adjacent drifts and immediately below the initial sill drifts with minimum dilution. Due to the permit constraints imposed on mining at Olympias Mine, after an environmental impact assessment, there is a requirement that the final backfill strength must reach a uniaxial compressive strength (UCS) of 4.0 MPa at 28-day cure age. By developing a suit of mix recipes incorporating superplasticiser admixtures, it was possible to achieve the strength demands and the workability of the backfill. This paper presents the results from comprehensive test work conducted on whole mill tailings and cyclone mill tailings to produce high strength backfill.","PeriodicalId":20480,"journal":{"name":"Proceedings of the 22nd International Conference on Paste, Thickened and Filtered Tailings","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2019-05-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the 22nd International Conference on Paste, Thickened and Filtered Tailings","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.36487/ACG_REP/1910_28_GROBLER","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

Abstract

Olympias Mine is operated by Hellas Gold S.A., a subsidiary of Eldorado Gold Corporation. The orebody shape and size are suitable for a drift and fill mining method. The mining sequence is overhand and the demand for backfill strengths are generally low except for the initial sill cuts. The design fill strengths are determined from the planned stope exposures to allow for safe extraction of the ore in adjacent drifts and immediately below the initial sill drifts with minimum dilution. Due to the permit constraints imposed on mining at Olympias Mine, after an environmental impact assessment, there is a requirement that the final backfill strength must reach a uniaxial compressive strength (UCS) of 4.0 MPa at 28-day cure age. By developing a suit of mix recipes incorporating superplasticiser admixtures, it was possible to achieve the strength demands and the workability of the backfill. This paper presents the results from comprehensive test work conducted on whole mill tailings and cyclone mill tailings to produce high strength backfill.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
希腊奥林匹亚斯矿山进路充填法高强度充填体设计
奥林匹亚斯金矿由埃尔多拉多黄金公司的子公司Hellas Gold s.a.经营。矿体形状和大小适合采用进路充填采矿法。采矿顺序是超前的,对充填体强度的要求一般较低,除了最初的台阶切割。设计充填强度是根据计划的采场暴露量确定的,以允许在相邻的巷道中安全提取矿石,并以最小的稀释度直接低于初始的巷道。由于奥林匹亚斯矿山采矿的许可证限制,在进行环境影响评估后,要求最终充填体强度在28天龄期必须达到4.0 MPa的单轴抗压强度(UCS)。通过开发一套含有高效增塑剂外加剂的混合配方,可以达到充填体的强度要求和和易性。本文介绍了采用全磨尾矿和旋流机尾矿生产高强度充填体的综合试验结果。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
An economy and ecosystem symbiosis: barrier systems for water conservation and pollution control Online rheology monitoring of a thickener underflow Applying image classification to develop artificial intelligence for tailings storage facility hazard monitoring using site-based cameras Disposal of tailings and the mining industry perspective: a case study of the Cuiabá Mine Underground paste fill reticulation management of system flow-loss
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1