{"title":"Rising to the salt extraction challenge","authors":"","doi":"10.12968/s0262-1762(22)70034-x","DOIUrl":null,"url":null,"abstract":"A salt extraction operation had to move quickly from an onshore to an offshore site supplied by 5 km of pipework. The company turned to flow control partner Celeros FT to help meet the unique circumstances encountered at the new salt well.","PeriodicalId":101286,"journal":{"name":"World Pumps","volume":"11 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-02-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"World Pumps","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.12968/s0262-1762(22)70034-x","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
A salt extraction operation had to move quickly from an onshore to an offshore site supplied by 5 km of pipework. The company turned to flow control partner Celeros FT to help meet the unique circumstances encountered at the new salt well.