Collaborative Project Procurement in the Construction Industry: Investigating the Drivers and Barriers in Malaysia

IF 0.8 Q4 CONSTRUCTION & BUILDING TECHNOLOGY Journal of Construction in Developing Countries Pub Date : 2022-01-01 DOI:10.21315/jcdc-10-21-0157
J. B. Yap, Sin Ying Lim
{"title":"Collaborative Project Procurement in the Construction Industry: Investigating the Drivers and Barriers in Malaysia","authors":"J. B. Yap, Sin Ying Lim","doi":"10.21315/jcdc-10-21-0157","DOIUrl":null,"url":null,"abstract":"The traditional construction procurement approach engenders adversarial attitudes and the pursuit of individual organisation’s gain has led to inefficiencies and poor project management. Previous studies suggest collaborative working in the construction supply chain may produce better outcomes. This paper examines the drivers and barriers to embracing collaborative procurement practices pertinent to the construction industry in the developing world; using Malaysia as a base of the study. Drawing on an empirical survey involving construction professionals (contractors, consultants and clients), the significance of the drivers and barriers are prioritised based on mean scores. The most significant drivers are better quality outcome, better cost control, better time control, effective problem solving and increased client satisfaction. As for the barriers, resistance to change current way of working, communication problem, incompatible personalities and organisational cultures, lack of top management support, and inadequate training and guidance rank the highest. Next, Kruskal-Wallis tests were selected to compare the results given by the three groups of respondents. All the drivers are homogeneously perceived except for ‘long-term relationship’. Homogeneous perceptions are observed for all drivers. Results from this study are expected to benefit both construction practitioners and researchers in the exploration, planning and implementation of collaboration-based project procurement arrangements.","PeriodicalId":51876,"journal":{"name":"Journal of Construction in Developing Countries","volume":"105 1","pages":""},"PeriodicalIF":0.8000,"publicationDate":"2022-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Construction in Developing Countries","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.21315/jcdc-10-21-0157","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"CONSTRUCTION & BUILDING TECHNOLOGY","Score":null,"Total":0}
引用次数: 0

Abstract

The traditional construction procurement approach engenders adversarial attitudes and the pursuit of individual organisation’s gain has led to inefficiencies and poor project management. Previous studies suggest collaborative working in the construction supply chain may produce better outcomes. This paper examines the drivers and barriers to embracing collaborative procurement practices pertinent to the construction industry in the developing world; using Malaysia as a base of the study. Drawing on an empirical survey involving construction professionals (contractors, consultants and clients), the significance of the drivers and barriers are prioritised based on mean scores. The most significant drivers are better quality outcome, better cost control, better time control, effective problem solving and increased client satisfaction. As for the barriers, resistance to change current way of working, communication problem, incompatible personalities and organisational cultures, lack of top management support, and inadequate training and guidance rank the highest. Next, Kruskal-Wallis tests were selected to compare the results given by the three groups of respondents. All the drivers are homogeneously perceived except for ‘long-term relationship’. Homogeneous perceptions are observed for all drivers. Results from this study are expected to benefit both construction practitioners and researchers in the exploration, planning and implementation of collaboration-based project procurement arrangements.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
建筑行业的合作项目采购:调查马来西亚的驱动因素和障碍
传统的建筑采购方式产生了敌对的态度,追求个人组织的利益导致了效率低下和项目管理不善。先前的研究表明,建筑供应链中的协作工作可能会产生更好的结果。本文考察了与发展中国家建筑行业相关的协作采购实践的驱动因素和障碍;以马来西亚为研究基地。根据一项涉及建筑专业人士(承包商、顾问和客户)的实证调查,基于平均得分对驱动因素和障碍的重要性进行了优先排序。最重要的驱动因素是更好的质量结果、更好的成本控制、更好的时间控制、有效的问题解决和更高的客户满意度。至于障碍,阻力改变目前的工作方式,沟通问题,性格和组织文化不相容,缺乏高层管理的支持,培训和指导不足是排名最高的。接下来,选择Kruskal-Wallis测试来比较三组受访者给出的结果。除了“长期关系”外,所有的驱动因素都是同质的。所有司机的感知都是同质的。本研究的结果有望使建筑从业者和研究人员在探索、规划和实施基于合作的项目采购安排方面受益。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
Journal of Construction in Developing Countries
Journal of Construction in Developing Countries CONSTRUCTION & BUILDING TECHNOLOGY-
CiteScore
1.50
自引率
0.00%
发文量
25
审稿时长
20 weeks
期刊介绍: The Journal of Construction in Developing Countries seeks to provide a central vehicle for the exchange and dissemination of knowledge on issues relevant to the built environment of developing countries. The journal provides a wide range of original research an application papers on current developments and advances in the built environment as well as the economic, social, cultural and technological contexts of developing countries. It also publishes detailed case studies, as well as short communications and discussions. Topics covered include, but are not restricted to planning, urban economics, rural and regional development, housing, management and resource issues, sustiainability, knowledge and technology transfer, construction procurement, facilities management, information an communication technologies, strategies and policy issues, design issues, conservation and environmental issues.
期刊最新文献
The Impact of COVID-19 on the Construction Sector in Zimbabwe Barriers to Incident Reporting in the Pakistani Construction Industry: An Exploratory Factor Analysis Approach Assessing the Level of Resilience in Construction Safety Management Systems in the Construction Industry Exploring the Temporary Appropriation of Marginal Open Spaces in Urban Residential Neighbourhoods Information Technology as Catalyst for Value Re-Engineering Implementation in the Nigerian Construction Industry
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1