Jiqiang Su, Qun Liu, Honglin Zhang, Lei Shi, Hongjun Liu, Yanrui Li, Jian Hu
{"title":"Research on Establishing Efficient Scheduling System of Spent Fuel From Chinese Nuclear Power Plants","authors":"Jiqiang Su, Qun Liu, Honglin Zhang, Lei Shi, Hongjun Liu, Yanrui Li, Jian Hu","doi":"10.1115/icone29-92757","DOIUrl":null,"url":null,"abstract":"\n As the number of nuclear power plants put into operation in China continues to increase, more and more spent fuel is produced. Before the spent fuel leaves the spent fuel pool to the final disposal of the spent fuel, it needs to go through multiple and various forms of transportation and storage. By establishing an efficient scheduling system for spent fuel, the efficient scheduling and overall coordination of each link is crucial for the safe management of spent fuel. This paper studies the connotation of the efficient scheduling system of spent fuel. Based on the enlightenment of the establishment of the efficient scheduling system for spent fuel in major nuclear power countries, it analyzes the necessity and current situation of establishing an efficient scheduling system for spent fuel in China’s nuclear power plants, and puts forward relevant measures and suggestions.","PeriodicalId":36762,"journal":{"name":"Journal of Nuclear Fuel Cycle and Waste Technology","volume":"145 1","pages":""},"PeriodicalIF":0.4000,"publicationDate":"2022-08-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Nuclear Fuel Cycle and Waste Technology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1115/icone29-92757","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"NUCLEAR SCIENCE & TECHNOLOGY","Score":null,"Total":0}
引用次数: 0
Abstract
As the number of nuclear power plants put into operation in China continues to increase, more and more spent fuel is produced. Before the spent fuel leaves the spent fuel pool to the final disposal of the spent fuel, it needs to go through multiple and various forms of transportation and storage. By establishing an efficient scheduling system for spent fuel, the efficient scheduling and overall coordination of each link is crucial for the safe management of spent fuel. This paper studies the connotation of the efficient scheduling system of spent fuel. Based on the enlightenment of the establishment of the efficient scheduling system for spent fuel in major nuclear power countries, it analyzes the necessity and current situation of establishing an efficient scheduling system for spent fuel in China’s nuclear power plants, and puts forward relevant measures and suggestions.