Delivered Successfully an Open Hole Side-Track from Very Challenging Formation Through Very Narrow MD Window: A Case Study from Kuwait

Naser Al-Barazi, Faisal Al-naqa, M. Chouhan, A. Al-Mekhlef, Ashraf Mohammad Saleh, Ahmed N. F. Bahgat, M. Mustafa, Rashad Saleh, S. Abdelbaset, M. Al-Qnaai
{"title":"Delivered Successfully an Open Hole Side-Track from Very Challenging Formation Through Very Narrow MD Window: A Case Study from Kuwait","authors":"Naser Al-Barazi, Faisal Al-naqa, M. Chouhan, A. Al-Mekhlef, Ashraf Mohammad Saleh, Ahmed N. F. Bahgat, M. Mustafa, Rashad Saleh, S. Abdelbaset, M. Al-Qnaai","doi":"10.2118/205545-ms","DOIUrl":null,"url":null,"abstract":"\n This article presents a unique case study where operating company, Kuwait Oil Company (KOC), decided to make an attempt to perform open hole side-track through a very narrow side-track window along with other exiting conditions such as severe downhole losses and drill through very challenging formation. To deliver such project in first attempt requires very detailed planning, close coordination with various service partners such as directional drilling and cementing.\n Placing a good side-track cement plug in such formation was a challenge, and 2nd challenge to get kicked off from this narrow window in first attempt which was the key. In case of failure, whip stock option has to be planned as a contingency, which possess new challenging of opening a depleted zone leading to commingling low/high pressure formation which could cause a complicated problem such as borehole stability, leads to stuck pipe problem. Failure to side-track from open hole could end of planning to drill extra hole which required extra casing string to run which will put this project well over AFE and heavily impact on well objective.\n This open hole Side-track was planned because while drilling original hole (12 ¼\" hole section) close to planned well TD, experienced complete losses. In attempt to cure the losses, LCM was pumped with no success. Performed thixotropic cement plug job for losses control. While performing thixotropic cement plug job, the cement flash set before finishing the displacement, leading to stuck string. After backing off string and fishing attempts, unable to recover the fish completely. Fish left in hole leading to only 68 ft of open hole window available to side-track where performing a cement job was impossible due to severe losses. Only way to secure the well is to try for open hole side-track. With existing sever loss situation for initiating open hole side-track was a serious challenge due to lack of side force and flow restriction to initiate the side-track.\n Extensive pre-job planning, peer review and risk assessment was done in coordination with various service partners to deliver such challenging side-track. A hazard analysis decision tree was established to pinpoint the risks and appropriate mitigation measures along with contingency plan put in place. A detailed side-track guidelines was shared and review with the field crew.\n The wellbore was successfully side-tracked through a challenging reactive shale formation in a first attempt using a customized kick-off BHA, which not only helped to avoid loss zone in side-tracked hole but also provide additional cost savings to the company. The good hole condition at the side-track point was important to enable smooth passing of the following directional BHA to achieve directional goals.","PeriodicalId":11052,"journal":{"name":"Day 3 Thu, October 14, 2021","volume":"25 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2021-10-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 3 Thu, October 14, 2021","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/205545-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

This article presents a unique case study where operating company, Kuwait Oil Company (KOC), decided to make an attempt to perform open hole side-track through a very narrow side-track window along with other exiting conditions such as severe downhole losses and drill through very challenging formation. To deliver such project in first attempt requires very detailed planning, close coordination with various service partners such as directional drilling and cementing. Placing a good side-track cement plug in such formation was a challenge, and 2nd challenge to get kicked off from this narrow window in first attempt which was the key. In case of failure, whip stock option has to be planned as a contingency, which possess new challenging of opening a depleted zone leading to commingling low/high pressure formation which could cause a complicated problem such as borehole stability, leads to stuck pipe problem. Failure to side-track from open hole could end of planning to drill extra hole which required extra casing string to run which will put this project well over AFE and heavily impact on well objective. This open hole Side-track was planned because while drilling original hole (12 ¼" hole section) close to planned well TD, experienced complete losses. In attempt to cure the losses, LCM was pumped with no success. Performed thixotropic cement plug job for losses control. While performing thixotropic cement plug job, the cement flash set before finishing the displacement, leading to stuck string. After backing off string and fishing attempts, unable to recover the fish completely. Fish left in hole leading to only 68 ft of open hole window available to side-track where performing a cement job was impossible due to severe losses. Only way to secure the well is to try for open hole side-track. With existing sever loss situation for initiating open hole side-track was a serious challenge due to lack of side force and flow restriction to initiate the side-track. Extensive pre-job planning, peer review and risk assessment was done in coordination with various service partners to deliver such challenging side-track. A hazard analysis decision tree was established to pinpoint the risks and appropriate mitigation measures along with contingency plan put in place. A detailed side-track guidelines was shared and review with the field crew. The wellbore was successfully side-tracked through a challenging reactive shale formation in a first attempt using a customized kick-off BHA, which not only helped to avoid loss zone in side-tracked hole but also provide additional cost savings to the company. The good hole condition at the side-track point was important to enable smooth passing of the following directional BHA to achieve directional goals.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
通过非常窄的MD窗口,在非常具有挑战性的地层中成功完成了裸眼侧钻:科威特案例研究
本文介绍了一个独特的案例研究,科威特石油公司(KOC)决定尝试通过一个非常狭窄的侧钻窗进行裸眼侧钻,同时考虑到其他一些现有条件,如严重的井下漏失和非常具有挑战性的地层。第一次尝试交付这样的项目需要非常详细的规划,与各种服务合作伙伴(如定向钻井和固井)密切协调。在这样的地层中放置一个良好的侧轨水泥塞是一个挑战,而第二次尝试从这个狭窄的窗口中被踢出是一个挑战,这是关键。如果出现故障,则必须制定应急方案,这将带来新的挑战,即打开衰竭区域,导致低压/高压地层混合,可能导致井眼稳定性等复杂问题,并导致卡钻问题。如果不能从裸眼井开始侧钻,可能会导致额外的井眼计划终止,这就需要额外的套管柱,这将使该项目的井位于AFE之上,并严重影响井的目标。之所以选择这条裸眼侧轨,是因为在接近计划井深的原始井眼(12¼”井段)钻进时,出现了完全的漏失。为了弥补损失,LCM被注入了大量资金,但没有成功。进行触变水泥塞作业,控制漏失。在进行触变水泥塞作业时,在顶替完成之前,水泥闪封,导致管柱卡钻。在退下鱼线和尝试钓鱼后,无法完全收回鱼。鱼片留在井内,导致只有68英尺的裸眼窗口可用于侧钻,由于严重漏失,无法进行固井作业。确保井安全的唯一方法是尝试裸眼侧钻。由于缺乏侧力和流体限制来启动侧钻,在目前严重漏失的情况下,开启裸眼侧钻是个严峻的挑战。在与各种服务合作伙伴的协调下,进行了广泛的作业前规划、同行评审和风险评估,以提供这种具有挑战性的支线。建立了危害分析决策树,以查明风险和适当的缓解措施,并制定了应急计划。与现场工作人员分享并审查了详细的侧边指导方针。在首次尝试中,使用定制的启动BHA成功地通过了一个具有挑战性的反应性页岩地层,这不仅有助于避免侧轨井的漏失区域,还为公司节省了额外的成本。侧轨点处良好的井况对于确保后续定向BHA的顺利通过以实现定向目标至关重要。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Long-Term Forecasting and Optimization of Non-Stationary Well Operation Modes Through Neural Networks Simulation A Case Study for the Development and Use of a Well Control Simulator as a Digital Twin of a Real Scenario The Choice of the Optimal Strategy for the Use of Solvents of High-Molecular Organic Deposits, Considering their Complex Composition and the Effect on the Oil Dispersion System Restoration of Seismic Data Using Inpainting and EdgeConnect Delineating the Multi-Stacked Domanik Play in the Volga-Urals Basin, Russia
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1