Rationalized Timetabling Using a Simulation Tool: A Paradigm Shift in Indian Railways

IF 1.1 4区 管理学 Q4 MANAGEMENT Informs Journal on Applied Analytics Pub Date : 2023-03-21 DOI:10.1287/inte.2023.1158
K. Anoop, A. M. Reddy, Mandeep Singh Bhatia, A. K. Jain, R. Gopalakrishnan, Merajus Salekin, Samay Pritam Singh, R. V. Satwik, Sudarshan Pulapadi, Chandrashekhar Bobade, I. S. Kumar, Shivasubramanian Gopalakrishnan, K. Appaiah, N. Rangaraj, M. Belur
{"title":"Rationalized Timetabling Using a Simulation Tool: A Paradigm Shift in Indian Railways","authors":"K. Anoop, A. M. Reddy, Mandeep Singh Bhatia, A. K. Jain, R. Gopalakrishnan, Merajus Salekin, Samay Pritam Singh, R. V. Satwik, Sudarshan Pulapadi, Chandrashekhar Bobade, I. S. Kumar, Shivasubramanian Gopalakrishnan, K. Appaiah, N. Rangaraj, M. Belur","doi":"10.1287/inte.2023.1158","DOIUrl":null,"url":null,"abstract":"During the year 2020, Indian Railways undertook an extensive timetabling exercise for its entire network. The timetable for its six principal routes known as the golden quadrilateral + diagonals (GQD) was generated using a rail traffic simulation tool. The simulation tool and the methodology had to be customized to handle the complex technical requirements of the GQD network, which spans more than 9,000 km. Challenges related to using and integrating data into the simulator also had to be addressed. This was the first time that a simulation software tool of this kind was used for timetabling in Indian Railways, and hence, there were uncertainties regarding the timely delivery, which gave rise to additional challenges to the overall effort. This paper focuses on these challenges and the managerial and human aspects of this massive timetabling exercise. It also explains how this project leverages the benefits of combining top-down and bottom-up approaches in timetabling and how it sets a new paradigm for network-wide timetabling in Indian Railways. History: This paper was refereed. Funding: This work was supported financially through the Indian Railways–sponsored project titled “Implementing Zero Based Timetabling for Major IR Routes by IIT Bombay through Simulation Model of Mixed Rail Traffic” [Grant RD/0120-WRAIL00-002].","PeriodicalId":53206,"journal":{"name":"Informs Journal on Applied Analytics","volume":"37 1","pages":""},"PeriodicalIF":1.1000,"publicationDate":"2023-03-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Informs Journal on Applied Analytics","FirstCategoryId":"91","ListUrlMain":"https://doi.org/10.1287/inte.2023.1158","RegionNum":4,"RegionCategory":"管理学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"MANAGEMENT","Score":null,"Total":0}
引用次数: 0

Abstract

During the year 2020, Indian Railways undertook an extensive timetabling exercise for its entire network. The timetable for its six principal routes known as the golden quadrilateral + diagonals (GQD) was generated using a rail traffic simulation tool. The simulation tool and the methodology had to be customized to handle the complex technical requirements of the GQD network, which spans more than 9,000 km. Challenges related to using and integrating data into the simulator also had to be addressed. This was the first time that a simulation software tool of this kind was used for timetabling in Indian Railways, and hence, there were uncertainties regarding the timely delivery, which gave rise to additional challenges to the overall effort. This paper focuses on these challenges and the managerial and human aspects of this massive timetabling exercise. It also explains how this project leverages the benefits of combining top-down and bottom-up approaches in timetabling and how it sets a new paradigm for network-wide timetabling in Indian Railways. History: This paper was refereed. Funding: This work was supported financially through the Indian Railways–sponsored project titled “Implementing Zero Based Timetabling for Major IR Routes by IIT Bombay through Simulation Model of Mixed Rail Traffic” [Grant RD/0120-WRAIL00-002].
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
使用模拟工具的合理化时间表:印度铁路的范式转变
在2020年期间,印度铁路公司对其整个网络进行了广泛的时间表编制工作。其被称为黄金四边形+对角线(GQD)的六条主要路线的时间表是使用铁路交通模拟工具生成的。模拟工具和方法必须定制,以处理跨越9000多公里的GQD网络的复杂技术要求。与使用数据和将数据集成到模拟器中有关的挑战也必须得到解决。这是印度铁路第一次使用这种模拟软件工具来制定时间表,因此,在及时交付方面存在不确定性,这给整体工作带来了额外的挑战。本文的重点是这些挑战和管理和人的方面,这一大规模的时间表练习。它还解释了该项目如何利用自上而下和自下而上的时间表方法相结合的好处,以及它如何为印度铁路的全网时间表制定树立了新的范例。历史:本文被审稿。资助:这项工作由印度铁路公司资助的项目“印度理工学院孟买分校通过混合轨道交通模拟模型实施主要IR路线的零基础时间表”提供资金支持[Grant RD/0120-WRAIL00-002]。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
21.40%
发文量
51
期刊最新文献
Alleviating Court Congestion: The Case of the Jerusalem District Court Data-Driven Order Fulfillment Consolidation for Online Grocery Retailing In Memoriam: Srinagesh Gavirneni, 1967–2023 Applying Analytics to Design Lung Transplant Allocation Policy Introduction: 2022 Daniel H. Wagner Prize for Excellence in the Practice of Advanced Analytics and Operations Research
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1