Concerns of Airborne Ammonia in Ice-Production Facilities: Enhancing protection of workers in Malaysia.

Hazlina Yon
{"title":"Concerns of Airborne Ammonia in Ice-Production Facilities: Enhancing protection of workers in Malaysia.","authors":"Hazlina Yon","doi":"10.11113/jest.v5n2.132","DOIUrl":null,"url":null,"abstract":"A study on profiling of ammonia concentration and its validation using two types of direct reading instruments has been conducted for eight months from September 2021 till May 2022 in four different zones in West Malaysia. The study is using a high performance multigas analyzer integrated with Fourier Transform Infrared (FTIR) and Multirae data analyzer to measure ammonia concentration in thirty-eight ice-production facilities in Malaysia. This study is limited to databases of ice-production facilities registered with the Department of Occupational Safety and Health (DOSH) Malaysia. The study involves thirty-eight ice-production facilities with fourteen compliance verification using USECHH checklist. The results of monitoring and validation confirmed that ammonia is detected at various locations in the factory layout. It is found to be localized and concentrated at the machine room followed by machine room combined with production room.  Both instruments seem to show similar trend which can validate the profile obtained for ammonia in the ice facilities. Recommendations are suggested for employers to improve layout of the ice-production facilities based on these measurements. \nThe study also seeks to find a correlation between the compliance of these facilities with the Use and Standards of Exposure of Chemicals Hazardous to Health (USECHH) Regulations 2000 and compliance with ammonia checklist from the Guideline of Safe Management of Ammonia Refrigeration System 2020. Pre and post assessment is conducted using the same ammonia checklist to identify any gap. It was found that the results obtained for the USECHH compliance, ammonia checklist compliance either pre or post assessment are not positively correlated. This finding emphasizes that there is still a lack of commitment from these ice-production facilities even after the visits by authorities. Comparison between the monitoring data and the degree of compliance using ammonia checklist from the said guideline was also made. The results obtained emphasize that there is no strong correlation between the monitoring data and the degree of compliance using the ammonia checklist. \n            This study shows an insight of chemical management in Malaysia at ice-production facilities and provides suggestions, recommendations, measures and outcomes of enforcement. Future measures to be taken is also suggested to boost compliance. At the same time, the outcomes and implications of this study on chemical management and chemical safety status in Malaysia can also assist other developing countries to improve their chemical management. Future research with risk modelling of ammonia leakages could also be ventured into. Ice plants are recommended to redesign their layout based on this study. \nKeywords: ammonia profiling, compliance enforcement, ice production facilities, lack of commitment, USECHH compliance.","PeriodicalId":15706,"journal":{"name":"Journal of Energy and Safety Technology (JEST)","volume":"1 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2023-02-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Energy and Safety Technology (JEST)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.11113/jest.v5n2.132","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

A study on profiling of ammonia concentration and its validation using two types of direct reading instruments has been conducted for eight months from September 2021 till May 2022 in four different zones in West Malaysia. The study is using a high performance multigas analyzer integrated with Fourier Transform Infrared (FTIR) and Multirae data analyzer to measure ammonia concentration in thirty-eight ice-production facilities in Malaysia. This study is limited to databases of ice-production facilities registered with the Department of Occupational Safety and Health (DOSH) Malaysia. The study involves thirty-eight ice-production facilities with fourteen compliance verification using USECHH checklist. The results of monitoring and validation confirmed that ammonia is detected at various locations in the factory layout. It is found to be localized and concentrated at the machine room followed by machine room combined with production room.  Both instruments seem to show similar trend which can validate the profile obtained for ammonia in the ice facilities. Recommendations are suggested for employers to improve layout of the ice-production facilities based on these measurements. The study also seeks to find a correlation between the compliance of these facilities with the Use and Standards of Exposure of Chemicals Hazardous to Health (USECHH) Regulations 2000 and compliance with ammonia checklist from the Guideline of Safe Management of Ammonia Refrigeration System 2020. Pre and post assessment is conducted using the same ammonia checklist to identify any gap. It was found that the results obtained for the USECHH compliance, ammonia checklist compliance either pre or post assessment are not positively correlated. This finding emphasizes that there is still a lack of commitment from these ice-production facilities even after the visits by authorities. Comparison between the monitoring data and the degree of compliance using ammonia checklist from the said guideline was also made. The results obtained emphasize that there is no strong correlation between the monitoring data and the degree of compliance using the ammonia checklist.             This study shows an insight of chemical management in Malaysia at ice-production facilities and provides suggestions, recommendations, measures and outcomes of enforcement. Future measures to be taken is also suggested to boost compliance. At the same time, the outcomes and implications of this study on chemical management and chemical safety status in Malaysia can also assist other developing countries to improve their chemical management. Future research with risk modelling of ammonia leakages could also be ventured into. Ice plants are recommended to redesign their layout based on this study. Keywords: ammonia profiling, compliance enforcement, ice production facilities, lack of commitment, USECHH compliance.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
对制冰设施中空气中氨的关注:加强对马来西亚工人的保护。
从2021年9月到2022年5月,在西马来西亚的四个不同地区进行了为期八个月的氨浓度分析及其验证研究,使用两种类型的直读仪器。该研究使用集成了傅里叶变换红外(FTIR)和Multirae数据分析仪的高性能多气体分析仪来测量马来西亚38个制冰设施的氨浓度。这项研究仅限于在马来西亚职业安全与健康部门(DOSH)注册的制冰设施数据库。该研究涉及38个制冰设施,其中14个设施使用USECHH检查表进行符合性验证。监测和验证的结果证实在工厂布局的各个位置都检测到氨。结果发现,主要集中在机房,其次是机房与生产机房相结合。两种仪器似乎显示出相似的趋势,这可以验证冰设施中氨的剖面。根据这些测量结果,对雇主提出了改进制冰设施布局的建议。该研究还试图找出这些设施是否符合《2000年对健康有害化学品的使用和暴露标准》(USECHH)法规,以及是否符合《2020年氨制冷系统安全管理指南》中的氨清单之间的相关性。使用相同的氨检查表进行前后评估,以确定任何差距。结果发现,USECHH符合性与氨检查表符合性评价前后均不存在正相关关系。这一发现强调,即使在当局访问之后,这些制冰设施仍然缺乏承诺。并将监测数据与指南中氨检查表的符合性进行了比较。得到的结果强调,监测数据与使用氨检查表的依从程度之间没有很强的相关性。本研究展示了马来西亚制冰设施化学品管理的见解,并提供了建议、建议、措施和执法结果。报告还提出了未来采取的措施,以促进合规。同时,本研究关于马来西亚化学品管理和化学品安全状况的结果和意义也可以帮助其他发展中国家改善其化学品管理。未来的氨泄漏风险模型研究也可以冒险进行。在此基础上,建议冰厂重新设计其布局。关键词:氨分析,合规执行,制冰设施,缺乏承诺,USECHH合规。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
DEVELOPMENT OF PREVENTIVE COUNTERMEASURES TO COMBAT COVID-19 PANDEMIC IN SMALL AND MEDIUM-SIZED ENTERPRISES IN MALAYSIA AEDES SURVEILLANCE AND OVIPOSITION PREFERENCES: A CASE STUDY WITHIN UNIVERSITY CAMPUS AND HOSPITAL AREA SIZING ALGORITHM OF SOLAR-POWERED WATER PUMPING SYSTEM FOR DOMESTIC APPLICATION USING PARTICLE SWARM OPTIMIZATION ESCALATOR STEP DISPLACEMENT’S ACCIDENT: FORENSIC ENGINEERING APPROACH TAGUCHI OPTIMIZATION OF WATER SAVONIUS TURBINE FOR LOW-VELOCITY INLETS USING CFD APPROACH
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1