{"title":"Distributed PD measurement on power underground cables","authors":"V. R. Garcia-Colon","doi":"10.1109/ELINSL.2002.995880","DOIUrl":null,"url":null,"abstract":"In this paper a multi point partial discharge (PD) measurement approach is presented and named as distributed PD measurement (D-PDM). These D-PDM technique records PD pulses using an ultra wide band system that allow spatial discrimination due to high frequency signals rapid decay while displaying the output in a traditional Q-F-N pattern to facilitate problem identification. D-PDM was applied to evaluate an underground radial and meshed distribution networks with over 70 three phase PILC circuits while in normal operation. Several incipient fault sites were located and a predictive maintenance program established using this technique.","PeriodicalId":10532,"journal":{"name":"Conference Record of the the 2002 IEEE International Symposium on Electrical Insulation (Cat. No.02CH37316)","volume":"5 1","pages":"57-61"},"PeriodicalIF":0.0000,"publicationDate":"2002-04-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"6","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Conference Record of the the 2002 IEEE International Symposium on Electrical Insulation (Cat. No.02CH37316)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ELINSL.2002.995880","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 6
Abstract
In this paper a multi point partial discharge (PD) measurement approach is presented and named as distributed PD measurement (D-PDM). These D-PDM technique records PD pulses using an ultra wide band system that allow spatial discrimination due to high frequency signals rapid decay while displaying the output in a traditional Q-F-N pattern to facilitate problem identification. D-PDM was applied to evaluate an underground radial and meshed distribution networks with over 70 three phase PILC circuits while in normal operation. Several incipient fault sites were located and a predictive maintenance program established using this technique.