X. Qiu, B. Qian, Zi-Qi Zhang, Zuo-cheng Li, Ning Guo
{"title":"Improved EDA-Based Hyper-heuristic for Flexible Job Shop Scheduling Problem with Sequence-Independent Setup Times and Resource Constraints","authors":"X. Qiu, B. Qian, Zi-Qi Zhang, Zuo-cheng Li, Ning Guo","doi":"10.1007/978-981-99-4755-3_19","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":6815,"journal":{"name":"2021 Tenth International Conference on Intelligent Computing and Information Systems (ICICIS)","volume":"1 1","pages":"218-228"},"PeriodicalIF":0.0000,"publicationDate":"2023-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2021 Tenth International Conference on Intelligent Computing and Information Systems (ICICIS)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1007/978-981-99-4755-3_19","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}