An Innovative Analytical Network Process Model for Evaluation and Management of Maintenance Projects in Engineering Plant Field

IF 0.7 4区 计算机科学 Q4 AUTOMATION & CONTROL SYSTEMS Modeling Identification and Control Pub Date : 2017-01-01 DOI:10.2316/P.2017.848-010
Antonio Bleve, Federica Cugnach, L. Damiani, Nicolò Ghiglione, R. Revetria, Francesca Piccini
{"title":"An Innovative Analytical Network Process Model for Evaluation and Management of Maintenance Projects in Engineering Plant Field","authors":"Antonio Bleve, Federica Cugnach, L. Damiani, Nicolò Ghiglione, R. Revetria, Francesca Piccini","doi":"10.2316/P.2017.848-010","DOIUrl":null,"url":null,"abstract":"The proposed paper presents: the description and the analysis of an Analytic Network Process Model for the evaluation and the management of maintenance projects in engineering plant field. The study was made in Ansaldo Energia (AEN), Italian company active in the energy sector, one of the world’s major power plant producers. The test cases are three power plants belonging to three important Service customers. Three service contracts that respectively represent, from an HSE (Health Safety Environment) point of view, the “as was”, the “as is” and the “to be” are presented and discussed aiming to demonstrate that HSE could be improved in a systematic way. These three examples are characterized by an increase in HSE preventive activities more than the simple actions required to be compliant with HSE laws and rules. The complex of the HSE measures, known in Ansaldo as “HSE package”, are generally proposed in service contracts with the aim of improving the overall Customer Satisfaction that, recently, is strictly connected with HSE. Due to a rising general awareness of HSE, many general contractors are facing the complex trade-off among HSE performances improvement and other project KPI (Key Performance Indicator) related to cost saving, making this business even harder than expected. Finally this paper tries to answer these research questions: Is the HSE project with more preventive actions effectively the best project to be implemented by Ansaldo? How much does an improvement of Customer Satisfaction and HSE cost to the company in terms of time and effort?","PeriodicalId":49801,"journal":{"name":"Modeling Identification and Control","volume":"07 1","pages":""},"PeriodicalIF":0.7000,"publicationDate":"2017-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Modeling Identification and Control","FirstCategoryId":"94","ListUrlMain":"https://doi.org/10.2316/P.2017.848-010","RegionNum":4,"RegionCategory":"计算机科学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"AUTOMATION & CONTROL SYSTEMS","Score":null,"Total":0}
引用次数: 0

Abstract

The proposed paper presents: the description and the analysis of an Analytic Network Process Model for the evaluation and the management of maintenance projects in engineering plant field. The study was made in Ansaldo Energia (AEN), Italian company active in the energy sector, one of the world’s major power plant producers. The test cases are three power plants belonging to three important Service customers. Three service contracts that respectively represent, from an HSE (Health Safety Environment) point of view, the “as was”, the “as is” and the “to be” are presented and discussed aiming to demonstrate that HSE could be improved in a systematic way. These three examples are characterized by an increase in HSE preventive activities more than the simple actions required to be compliant with HSE laws and rules. The complex of the HSE measures, known in Ansaldo as “HSE package”, are generally proposed in service contracts with the aim of improving the overall Customer Satisfaction that, recently, is strictly connected with HSE. Due to a rising general awareness of HSE, many general contractors are facing the complex trade-off among HSE performances improvement and other project KPI (Key Performance Indicator) related to cost saving, making this business even harder than expected. Finally this paper tries to answer these research questions: Is the HSE project with more preventive actions effectively the best project to be implemented by Ansaldo? How much does an improvement of Customer Satisfaction and HSE cost to the company in terms of time and effort?
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
一种创新的工程设备维修项目评估与管理分析网络过程模型
本文提出了一种用于工程设备维修项目评估与管理的网络过程分析模型。这项研究是由安萨尔多能源公司(AEN)进行的,这是一家活跃在能源领域的意大利公司,是世界上主要的发电厂生产商之一。测试用例是属于三个重要服务客户的三个发电厂。从HSE(健康安全环境)的角度,分别提出和讨论了“过去”、“现在”和“未来”的三种服务合同,旨在证明HSE可以通过系统的方式得到改善。这三个例子的特点是HSE预防活动的增加,而不仅仅是遵守HSE法律法规所需的简单行动。这些综合的HSE措施,在Ansaldo中被称为“HSE一揽子措施”,通常在服务合同中提出,目的是提高客户的整体满意度,最近,这与HSE严格相关。随着人们对HSE意识的不断提高,许多总承包商正面临着在HSE绩效改善和其他与成本节约相关的项目KPI(关键绩效指标)之间进行权衡的复杂局面,这使得这项业务比预期的要困难得多。最后,本文试图回答这些研究问题:具有更多有效预防措施的HSE项目是否是安萨尔多实施的最佳项目?从时间和精力的角度来看,提高客户满意度和HSE对公司的成本是多少?
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
Modeling Identification and Control
Modeling Identification and Control 工程技术-计算机:控制论
CiteScore
3.30
自引率
0.00%
发文量
6
审稿时长
>12 weeks
期刊介绍: The aim of MIC is to present Nordic research activities in the field of modeling, identification and control to the international scientific community. Historically, the articles published in MIC presented the results of research carried out in Norway, or sponsored primarily by a Norwegian institution. Since 2009 the journal also accepts papers from the other Nordic countries.
期刊最新文献
Programming Fine Manufacturing Tasks on Collaborative Robots: A Case Study on Industrial Gluing Microevolutionary system identification and climate response predictions by use of BLUP prediction error method Improving Energy Efficiency and Response Time of an Offshore Winch Drive with Digital Displacement Motors A Novel Control Design for Realizing Passive Load-Holding Function on a Two-Motor-Two-Pump Motor-Controlled Hydraulic Cylinder Construct, Merge, Solve and Adapt Applied to the Maximum Disjoint Dominating Sets Problem
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1