Borehole Rehabilitation: A Case Study in the Dunkwa Mining Town

A. Ewusi, J. Seidu
{"title":"Borehole Rehabilitation: A Case Study in the Dunkwa Mining Town","authors":"A. Ewusi, J. Seidu","doi":"10.4314/gm.v20i2.2","DOIUrl":null,"url":null,"abstract":"Rehabilitation works were carried out on boreholes in the Dunkwa Mining town in the Central Region of Ghana. These works were carried out because the boreholes had lost their original yields due to clogging, corrosion and encrustation and had been abandoned for a long time. The cost of drilling a new well and assessing the productivity of the well is $4,500 which is more expensive that carrying out rehabilitation works which is cheaper, about $800. Also, the initial yields of the boreholes were very high according to the feasibility report which is not a common characteristic of the rocks in the area. Camera inspection followed by rehabilitation, pre and post pumping tests were carried out to assess whether there has been an improvement in their yield after the exercise and that the yield obtained will be adequate for a water supply design. Results show that all the boreholes had an improvement in their yields (57.19 - 259.80 %) after the rehabilitation. It can therefore be concluded that rehabilitation is effective in restoring boreholes to their original yields. Organisations drilling boreholes to communities can take advantage of rehabilitation of the existing boreholes located in the communities which are high yielding, thereby reducing project implementation cost. \nKeywords: Borehole Rehabilitation, Borehole Yields, Borehole Camera Inspection, Pumping Test","PeriodicalId":12530,"journal":{"name":"Ghana Mining Journal","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2020-12-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Ghana Mining Journal","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.4314/gm.v20i2.2","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Rehabilitation works were carried out on boreholes in the Dunkwa Mining town in the Central Region of Ghana. These works were carried out because the boreholes had lost their original yields due to clogging, corrosion and encrustation and had been abandoned for a long time. The cost of drilling a new well and assessing the productivity of the well is $4,500 which is more expensive that carrying out rehabilitation works which is cheaper, about $800. Also, the initial yields of the boreholes were very high according to the feasibility report which is not a common characteristic of the rocks in the area. Camera inspection followed by rehabilitation, pre and post pumping tests were carried out to assess whether there has been an improvement in their yield after the exercise and that the yield obtained will be adequate for a water supply design. Results show that all the boreholes had an improvement in their yields (57.19 - 259.80 %) after the rehabilitation. It can therefore be concluded that rehabilitation is effective in restoring boreholes to their original yields. Organisations drilling boreholes to communities can take advantage of rehabilitation of the existing boreholes located in the communities which are high yielding, thereby reducing project implementation cost. Keywords: Borehole Rehabilitation, Borehole Yields, Borehole Camera Inspection, Pumping Test
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
钻孔修复:以敦瓜矿业镇为例
在加纳中部地区的敦克瓦矿业镇进行了钻孔修复工程。进行这些工程是因为钻孔由于堵塞、腐蚀和结壳而失去了原来的产量,并且已经废弃了很长时间。钻一口新井并评估一口井的生产力的成本是4500美元,比进行修复工程的成本要高,而修复工程的成本较低,约为800美元。此外,根据可行性报告,钻孔的初始产量非常高,这不是该地区岩石的共同特征。摄象机检查后,进行了修复、抽水前和抽水后的测试,以评估测试后的产量是否有所改善,以及所获得的产量是否足以满足供水设计。结果表明,修复后所有井的产量均有提高(57.19% ~ 259.80%)。因此可以得出结论,修复是有效的,可以使钻孔恢复到原来的产量。向社区钻孔的组织可以利用社区内现有高产量钻孔的修复,从而降低项目实施成本。关键词:井眼修复,井眼产量,井眼摄像机检测,泵送试验
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Geotechnical Modeling of Optimal Pit: West Limb of the Tarkwaian of Ghana A Geoeconomic Planning and Evaluation Model for Artisanal Small-Scale Gold Mining in Ghana Beneficiation of Iron Oxides from Cupola Furnace Slags for Arsenic Removal from Mine Tailings Decant Water A Contactless IoT-Based GPS-Tracked Waste Bin to Curb Medical Waste Infections in Ghana Characterisation of Small-Scale Gold Mining Tailings in the Western Region of Ghana
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1