Prediction and Monitoring of Installation of Offshore Foundation Monopiles for Windfarms

Rob van Dorp, Nicolas Moscoso, M. Bielefeld, G. Verbeek
{"title":"Prediction and Monitoring of Installation of Offshore Foundation Monopiles for Windfarms","authors":"Rob van Dorp, Nicolas Moscoso, M. Bielefeld, G. Verbeek","doi":"10.4043/29400-MS","DOIUrl":null,"url":null,"abstract":"\n Upon recently, most offshore foundations were based on a number of driven piles that were installed with an impact hammer. With the increase in offshore windfarms two major developments have occurred: the shift from jackets to monopiles, leading to increase of the diameter of the foundation piles, and a shift from impact hammers to vibro hammers.\n As the use of vibratory hammers is becoming more and more common practice, the need for accurate vibro-driving simulation software has increased, which requires that the soil modelling is enhanced to address soil fatigue during pile driving and to predict reliably the soil behavior and resistance during pile driving. In addition pile driving monitoring, which is routine for piles driven with an impact hammer, needs to become common practice.\n This paper addresses advances in soil modelling that allows more accurate pile driving simulation as well as the application of Vibro Driving Analysis (VDA) or Monitoring (VDM) to validate the simulation results. This is illustrated by a case study of the test pile for the Delft Offshore Turbine project, a 28 m long monopile with a diameter of 4 m that was driven 15 m into dense sand layers using a vibro hammer. After some 6 months the pile was extracted, and pile driving simulations and VDA were done both for the installation and extraction phase.","PeriodicalId":11149,"journal":{"name":"Day 1 Mon, May 06, 2019","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2019-04-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 1 Mon, May 06, 2019","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.4043/29400-MS","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 4

Abstract

Upon recently, most offshore foundations were based on a number of driven piles that were installed with an impact hammer. With the increase in offshore windfarms two major developments have occurred: the shift from jackets to monopiles, leading to increase of the diameter of the foundation piles, and a shift from impact hammers to vibro hammers. As the use of vibratory hammers is becoming more and more common practice, the need for accurate vibro-driving simulation software has increased, which requires that the soil modelling is enhanced to address soil fatigue during pile driving and to predict reliably the soil behavior and resistance during pile driving. In addition pile driving monitoring, which is routine for piles driven with an impact hammer, needs to become common practice. This paper addresses advances in soil modelling that allows more accurate pile driving simulation as well as the application of Vibro Driving Analysis (VDA) or Monitoring (VDM) to validate the simulation results. This is illustrated by a case study of the test pile for the Delft Offshore Turbine project, a 28 m long monopile with a diameter of 4 m that was driven 15 m into dense sand layers using a vibro hammer. After some 6 months the pile was extracted, and pile driving simulations and VDA were done both for the installation and extraction phase.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
风电场海上基础单桩安装预测与监测
近年来,大多数海上基础都是基于一些用冲击锤安装的打入桩。随着海上风电场的增加,出现了两个主要的发展:从套桩到单桩的转变,导致基桩直径的增加,以及从冲击锤到振动锤的转变。随着振动锤的使用越来越普遍,对精确的振冲模拟软件的需求也越来越大,这就要求加强对土体的建模,以解决桩入过程中土体的疲劳问题,并可靠地预测桩入过程中土体的行为和阻力。此外,对冲击锤打桩的常规打桩监测也需要普及。本文讨论了土壤模型的进展,使更准确的打桩模拟以及应用振动打桩分析(VDA)或监测(VDM)来验证模拟结果。代尔夫特海上涡轮机项目测试桩的案例研究说明了这一点,这是一个28米长、直径4米的单桩,使用振动锤打入15米深的致密砂层。大约6个月后,进行了抽桩,并在安装和抽桩阶段进行了打桩模拟和VDA。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
A Detailed Look into the 2017 SNAME OC-8 Comparative Wind Load Study A Family of Practical Foundation Models for Dynamic Analyses of Offshore Wind Turbines Turret-Moored FPSO Yaw Motions in a Squall-Prone Region Ultra-Long Subsea Gas Condensate Tie Back – Pseudo Dry Gas – Liquid Handling System Deepwater Opportunities Extra Long Oil Tiebacks Developments
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1