{"title":"Use of Backcalculated Falling Weight Deflectometer Modulus for Detecting Foundation Problems Caused by Rubblization of Concrete Pavements","authors":"Y. Mehta, B. Birgisson, B. Choubane","doi":"10.1201/9781003078814-72","DOIUrl":null,"url":null,"abstract":"In 1998, two rubblized-pavement sections of Interstate 10 in Florida failed prematurely and showed severe rutting. During and after rubblization, large amount of water was observed flowing from edge drains next to the failed areas. Falling weight deflectometer measurements were taken immediately after rubblization, as well as one month and three months later. The backcalculated base and subgrade moduli showed softened sections immediately after rubblization, with a recovery period in excess of one month. A detailed study of the conditions leading to failure showed that the failure of the sections was likely due to the development of positive pore pressures in the base and subgrade during rubblization. These positive pore pressures lead to poor compaction after rubblization and severe rutting with localized potholes immediately after the first holiday traffic. Further analysis of the backcalculated moduli also showed that the problem was compounded by the absence of a tack-coat between the asphalt concrete and the rubblized layer, leading to poor load transfer to the lower layers. For the covering abstract see ITRD E118503.","PeriodicalId":11581,"journal":{"name":"Eleventh International Conference on the Bearing Capacity of Roads, Railways and Airfields, Volume 1","volume":"60 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2021-12-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Eleventh International Conference on the Bearing Capacity of Roads, Railways and Airfields, Volume 1","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1201/9781003078814-72","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

In 1998, two rubblized-pavement sections of Interstate 10 in Florida failed prematurely and showed severe rutting. During and after rubblization, large amount of water was observed flowing from edge drains next to the failed areas. Falling weight deflectometer measurements were taken immediately after rubblization, as well as one month and three months later. The backcalculated base and subgrade moduli showed softened sections immediately after rubblization, with a recovery period in excess of one month. A detailed study of the conditions leading to failure showed that the failure of the sections was likely due to the development of positive pore pressures in the base and subgrade during rubblization. These positive pore pressures lead to poor compaction after rubblization and severe rutting with localized potholes immediately after the first holiday traffic. Further analysis of the backcalculated moduli also showed that the problem was compounded by the absence of a tack-coat between the asphalt concrete and the rubblized layer, leading to poor load transfer to the lower layers. For the covering abstract see ITRD E118503.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
用反算落锤挠度计模量检测混凝土路面碎石地基问题
1998年,佛罗里达州10号州际公路的两个碎石路面路段过早损坏,出现了严重的车辙。在碎石期间和之后,观察到大量的水从破坏区域旁边的边缘排水沟流出。坠落重量偏转仪在碎石后立即进行测量,并在一个月和三个月后进行测量。反算基础和路基模量在碎石后立即出现软化断面,恢复期超过1个月。对导致破坏的条件的详细研究表明,断面的破坏可能是由于地基和路基在碎石过程中产生正孔隙压力。这些正孔隙压力导致碎石后压实不良,在第一次假期交通后立即出现严重车辙和局部凹坑。对反算模量的进一步分析还表明,由于沥青混凝土和碎石层之间没有粘接层,导致荷载传递到下层的能力较差,从而使问题更加复杂。相关摘要见ITRD E118503。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
In Situ Assessment of Stiffness of a Road Sand Embankment Variation in Calculated Pavement Performance Due to Variation in Input Data Evaluation of the Influence of Asphalt Concrete Pavement Discontinuities on Falling Weight Deflectometer Measurements Bearing Capacity of a Flexible Pavement during the Construction Phase Non-contact Deflection Measurement at High Speed
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1