Design and Implementation of a High Precision Time Synchronization Method for Borehole-surface Microseismic Monitoring

Yadongyang Zhu, Wen-peng Wei
{"title":"Design and Implementation of a High Precision Time Synchronization Method for Borehole-surface Microseismic Monitoring","authors":"Yadongyang Zhu, Wen-peng Wei","doi":"10.46300/9106.2022.16.98","DOIUrl":null,"url":null,"abstract":"Borehole-surface monitoring can effectively improve the accuracy of the microseismic event location. It is necessary to strictly synchronize the acquisition time of borehole and surface monitoring nodes. However, the synchronization signal transmission through the logging cable will cause a delay. In this paper, a calibration method designed to compensate for the deviation of time synchronization due to long-distance transmission on the logging cable. First, the transmission delay of the pulse per second (PPS) is measured in the delay measurement stage. The delay from the global positioning system (GPS) module to all monitoring nodes can get in sequence. Second, In the delay compensation stage, each monitoring node is delayed for a particular time to ensure that all nodes start working simultaneously. Finally, a high-precision clock source is designed to drive the analog-to-digital converter (ADC) to avoid the crystal oscillator’s accumulated error. To verify the accuracy of the calibration method, the modules were tested separately. The length of the logging cable used is 3000 meters. Through experimental verification, the method in this paper can be used to accurately control the time synchronization of different monitoring nodes in the borehole and on the surface within 1us.","PeriodicalId":13929,"journal":{"name":"International Journal of Circuits, Systems and Signal Processing","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2022-03-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Circuits, Systems and Signal Processing","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.46300/9106.2022.16.98","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"Engineering","Score":null,"Total":0}
引用次数: 0

Abstract

Borehole-surface monitoring can effectively improve the accuracy of the microseismic event location. It is necessary to strictly synchronize the acquisition time of borehole and surface monitoring nodes. However, the synchronization signal transmission through the logging cable will cause a delay. In this paper, a calibration method designed to compensate for the deviation of time synchronization due to long-distance transmission on the logging cable. First, the transmission delay of the pulse per second (PPS) is measured in the delay measurement stage. The delay from the global positioning system (GPS) module to all monitoring nodes can get in sequence. Second, In the delay compensation stage, each monitoring node is delayed for a particular time to ensure that all nodes start working simultaneously. Finally, a high-precision clock source is designed to drive the analog-to-digital converter (ADC) to avoid the crystal oscillator’s accumulated error. To verify the accuracy of the calibration method, the modules were tested separately. The length of the logging cable used is 3000 meters. Through experimental verification, the method in this paper can be used to accurately control the time synchronization of different monitoring nodes in the borehole and on the surface within 1us.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
井-地微震监测高精度时间同步方法的设计与实现
井地监测可以有效地提高微震事件定位的精度。必须严格同步井内和地面监测节点的采集时间。但是,通过测井电缆传输同步信号会产生延时。本文设计了一种校正方法来补偿由于测井电缆上的远距离传输造成的时间同步偏差。首先,在延迟测量阶段测量脉冲每秒(PPS)的传输延迟。从全球定位系统(GPS)模块到各监控节点的时延可以按顺序得到。在延迟补偿阶段,对每个监控节点进行一定的延迟,保证所有节点同时开始工作。最后,设计了高精度时钟源驱动模数转换器(ADC),避免了晶体振荡器的累积误差。为了验证标定方法的准确性,对各模块分别进行了测试。使用的测井电缆长度为3000米。通过实验验证,本文方法可以在1us内精确控制井内和地表不同监测节点的时间同步。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
International Journal of Circuits, Systems and Signal Processing
International Journal of Circuits, Systems and Signal Processing Engineering-Electrical and Electronic Engineering
自引率
0.00%
发文量
155
期刊最新文献
Stochastic Machine Learning Models for Mutation Rate Analysis of Malignant Cancer Cells in Patients with Acute Lymphoblastic Leukemia Detecting Small Objects Using a Smartphone and Neon Camera Optimization of New Energy Vehicle Road Noise Problem Based on Finite Element Analysis Method Base Elements for Artificial Neural Network: Structure Modeling, Production, Properties Distributed Generation Hosting Capacity Evaluation for Distribution Networks Considering Uncertainty
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1