{"title":"Managing Supply Risk in Fixed Price Contracts: A Contingent Claims Perspective","authors":"B. Kamrad, Ran Ji, Glen M. Schmidt","doi":"10.1561/0200000079","DOIUrl":null,"url":null,"abstract":"The primary focus of this paper is supply risk mitigation. though, its objectives are twofold. First, we develop a generic contingent claims model framed as an exercise in stochastic optimal control. The model is easily adjusted to a number of risk-based operational problems. Second, we adapt the model to the problem of supply uncertainty and the valuation of a fixed price contract with a focus on managing supply uncertainty through a portfolio based risk sharing framework. The risk and reward tradeoffs characterizing our general findings in this chapter indicate a subtle balance between supply risk, sourcing allocations and related costs, and accordingly, the resulting operational strategies considered. Given this setup, increased supplier-portfolio risk is a defining measure in establishing optimal operating policies, with the caveat that increases in the supplier portfolio’s volatility, also increase shortages which lowers the contract’s value.","PeriodicalId":39990,"journal":{"name":"Foundations and Trends in Technology, Information and Operations Management","volume":"1 1","pages":"65-88"},"PeriodicalIF":0.0000,"publicationDate":"2017-12-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Foundations and Trends in Technology, Information and Operations Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1561/0200000079","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
The primary focus of this paper is supply risk mitigation. though, its objectives are twofold. First, we develop a generic contingent claims model framed as an exercise in stochastic optimal control. The model is easily adjusted to a number of risk-based operational problems. Second, we adapt the model to the problem of supply uncertainty and the valuation of a fixed price contract with a focus on managing supply uncertainty through a portfolio based risk sharing framework. The risk and reward tradeoffs characterizing our general findings in this chapter indicate a subtle balance between supply risk, sourcing allocations and related costs, and accordingly, the resulting operational strategies considered. Given this setup, increased supplier-portfolio risk is a defining measure in establishing optimal operating policies, with the caveat that increases in the supplier portfolio’s volatility, also increase shortages which lowers the contract’s value.