{"title":"Optimal Scheduling of Delivery Plans in an Integrated Vendor - Buyer Inventory Model with Constant Deterioration and Three Phase Ramp Type Demand","authors":"Savitha, K. K. Achary","doi":"10.37622/ijaer/15.10.2020.1039-1048","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":36710,"journal":{"name":"International Journal of Applied Engineering Research (Netherlands)","volume":"63 1","pages":"1039-1048"},"PeriodicalIF":0.0000,"publicationDate":"2020-10-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Applied Engineering Research (Netherlands)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.37622/ijaer/15.10.2020.1039-1048","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"Engineering","Score":null,"Total":0}