Formalization of Phase Ordering

IF 0.1 4区 历史学 0 ARCHAEOLOGY Journal of Historic Buildings and Places Pub Date : 2016-06-20 DOI:10.4204/EPTCS.211.2
Tiago Cogumbreiro, J. Shirako, Vivek Sarkar
{"title":"Formalization of Phase Ordering","authors":"Tiago Cogumbreiro, J. Shirako, Vivek Sarkar","doi":"10.4204/EPTCS.211.2","DOIUrl":null,"url":null,"abstract":"Phasers pose an interesting synchronization mechanism that generalizes many collective synchronization patterns seen in parallel programming languages, including barriers, clocks, and point-to-point synchronization using latches or semaphores. This work characterizes scheduling constraints on phaser operations, by relating the execution state of two tasks that operate on the same phaser. We propose a formalization of Habanero phasers, May-Happen-In-Parallel, and Happens-Before relations for phaser operations, and show that these relations conform with the semantics. Our formalization and proofs are fully mechanized using the Coq proof assistant, and are available online.","PeriodicalId":53164,"journal":{"name":"Journal of Historic Buildings and Places","volume":"55 1","pages":"13-24"},"PeriodicalIF":0.1000,"publicationDate":"2016-06-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Historic Buildings and Places","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.4204/EPTCS.211.2","RegionNum":4,"RegionCategory":"历史学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"0","JCRName":"ARCHAEOLOGY","Score":null,"Total":0}
引用次数: 2

Abstract

Phasers pose an interesting synchronization mechanism that generalizes many collective synchronization patterns seen in parallel programming languages, including barriers, clocks, and point-to-point synchronization using latches or semaphores. This work characterizes scheduling constraints on phaser operations, by relating the execution state of two tasks that operate on the same phaser. We propose a formalization of Habanero phasers, May-Happen-In-Parallel, and Happens-Before relations for phaser operations, and show that these relations conform with the semantics. Our formalization and proofs are fully mechanized using the Coq proof assistant, and are available online.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
阶段排序的形式化
相位器提出了一种有趣的同步机制,它泛化了并行编程语言中的许多集体同步模式,包括屏障、时钟和使用锁存器或信号量的点对点同步。这项工作通过将在同一相位器上操作的两个任务的执行状态联系起来,表征了相位器操作的调度约束。我们提出了Habanero相移、May-Happen-In-Parallel和Happens-Before相移操作关系的形式化,并证明了这些关系符合语义。我们的形式化和证明是完全机械化使用Coq证明助理,并可在网上。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
8 Tōnosawa Tatara River Nakazu Harbor 3 Nakazu Harbor Aburanokōji Sanjō
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1