Causes of Delayed Payment in Construction Project in Nigeria

O. G. Odenigbo, K. Odusami, K. Okolie, V. C. Okafor
{"title":"Causes of Delayed Payment in Construction Project in Nigeria","authors":"O. G. Odenigbo, K. Odusami, K. Okolie, V. C. Okafor","doi":"10.24018/ejers.2020.5.9.2066","DOIUrl":null,"url":null,"abstract":"Delay in payment to contactors and other relevant parties have caused serious problem on the successful execution of construction projects in the country. It causes several problems to the contractor and other participants. The aim of this study is to determine the causes of delayed payments in the construction industry. The objective of this study is to identify the causes of delayed payment. In order to obtain valid data for the study, questionnaires were designed and distributed to a randomly selected sample of one hundred individuals among contractors, subcontractors, consultant and clients in the Nigerian construction industry. In total, eighty five completed questionnaires were returned and then analysed statistically. The total mean score was used to determine the ranking of the results of the study. Client’s disagreeing on the valuation of work done, slow processing of variation orders and poor quality of works were the major causes of delayed payment identified in the study. It was recommended that the stakeholders should work as a team in the execution of project to avoid bottlenecks usually encountered in agreeing contractors‟ payment. In conclusion, if the necessary action can be enforced, the problem of delayed payment can be reduced drastically.","PeriodicalId":12029,"journal":{"name":"European Journal of Engineering Research and Science","volume":"14 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2020-09-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"European Journal of Engineering Research and Science","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.24018/ejers.2020.5.9.2066","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 4

Abstract

Delay in payment to contactors and other relevant parties have caused serious problem on the successful execution of construction projects in the country. It causes several problems to the contractor and other participants. The aim of this study is to determine the causes of delayed payments in the construction industry. The objective of this study is to identify the causes of delayed payment. In order to obtain valid data for the study, questionnaires were designed and distributed to a randomly selected sample of one hundred individuals among contractors, subcontractors, consultant and clients in the Nigerian construction industry. In total, eighty five completed questionnaires were returned and then analysed statistically. The total mean score was used to determine the ranking of the results of the study. Client’s disagreeing on the valuation of work done, slow processing of variation orders and poor quality of works were the major causes of delayed payment identified in the study. It was recommended that the stakeholders should work as a team in the execution of project to avoid bottlenecks usually encountered in agreeing contractors‟ payment. In conclusion, if the necessary action can be enforced, the problem of delayed payment can be reduced drastically.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
尼日利亚建设项目延迟付款的原因
拖欠向承包商和其他有关方面付款已对该国建设项目的顺利实施造成严重问题。这给承包商和其他参与者带来了几个问题。本研究的目的是确定建筑业延迟付款的原因。本研究的目的是确定延迟付款的原因。为了获得有效的研究数据,调查问卷被设计并分发到尼日利亚建筑业承包商,分包商,顾问和客户中随机选择的100个人样本。共收回85份完整的问卷,并进行统计分析。总平均得分用于确定研究结果的排名。客户不同意对已完成工作的评估,变更订单处理缓慢以及工程质量差是研究中确定的延迟付款的主要原因。建议各利益相关者在项目执行中应作为一个团队合作,以避免在商定承包商付款时经常遇到的瓶颈。总之,如果能采取必要的行动,延迟付款的问题就能大大减少。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Introducing Secondary Education Students to Programming through Sound Alerts Optimal Sizing of a PV System in Golpayegan, Iran Using Thermal Modeling-based Load Demand Experimental Study of Twin Connected Pipe Jets Development and Assessment of Cracking and Sorting Processes of Palm Kernel Nut Machine Chemical Characterization of Nine Locally Made Cement Products for Quality Assurance in Nigeria Cement Industry
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1