{"title":"复合地层土压平衡盾构机连续下穿破旧房屋沉降分析技术 探讨","authors":"罗 昌军","doi":"10.26789/szgc.v7i5.1124","DOIUrl":null,"url":null,"abstract":"论文结合广州地铁十四号线二期乐嘉路站—岗贝站盾构分体始发连续下穿破旧房屋时,通过掘进速度与同步注浆压力之间的关系、同步注浆与掘进千斤顶油缸行程两者之间关系,分析探讨盾构机在复合地层连续下穿破旧房屋沉降分析技术的沉降的技术。","PeriodicalId":58331,"journal":{"name":"城乡建设","volume":"9 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-05-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"城乡建设","FirstCategoryId":"1087","ListUrlMain":"https://doi.org/10.26789/szgc.v7i5.1124","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
复合地层土压平衡盾构机连续下穿破旧房屋沉降分析技术 探讨
论文结合广州地铁十四号线二期乐嘉路站—岗贝站盾构分体始发连续下穿破旧房屋时,通过掘进速度与同步注浆压力之间的关系、同步注浆与掘进千斤顶油缸行程两者之间关系,分析探讨盾构机在复合地层连续下穿破旧房屋沉降分析技术的沉降的技术。