Enhanced Near Wellbore Acid Stimulation in Horizontal Open Hole Well Increased Influx from Tight Carbonate Formation in North Kuwait - Case Study.

R. Bhagavatula, H. Al-Ajeel, Alaeldin Boushi, W. Eid, M. Elmofti, A. Allam, Abdullah Alhamad
{"title":"Enhanced Near Wellbore Acid Stimulation in Horizontal Open Hole Well Increased Influx from Tight Carbonate Formation in North Kuwait - Case Study.","authors":"R. Bhagavatula, H. Al-Ajeel, Alaeldin Boushi, W. Eid, M. Elmofti, A. Allam, Abdullah Alhamad","doi":"10.2118/191893-MS","DOIUrl":null,"url":null,"abstract":"\n Well ‘A’ is a horizontal well drilled in the primary and productive upper layer of the carbonate reservoir just below 7,750 ft TVD, with lateral length of 3,495 ft. This layer, due to inherent well placement, presented completion and production challenges attributed to low permeability and with limited scope for production enhancement. The asset team required an effective solution to drain reserves from this well and for evaluating future well placements.\n Near-wellbore (NWB) acid stimulation technique was preferred over conventional acid fracturing due to low vertical stress contrast and high tortuosity effects caused by lateral azimuth relative to maximum stress orientation. Based on the Bernoulli concept for fluid diversion and using a dual path pumping system, initiation and propagation of micro-fractures was achieved by pumping fluid through tubing and annulus with a controlled pump schedule. A specially designed high-pressure tool was used for creating formation cavity by pumping acid through tubing. Increasing pressure on the bottom of cavity initiates micro-fracture causing annular fluid to be pulled into the fracture and subsequently extending it.\n The NWB stimulation was designed and carried out in 50 stages along the lateral. This was followed by 29-stage matrix acid stimulation using 20% HCl and with pulsonix tool for acid placement. Initial well productivity (PI) was estimated at 0.16 STB/D/psi. Post stimulation treatment resulted in a nine-fold PI improvement. Production post stimulation was 720 barrels oil per day (bopd) with 7% water cut (w.c).\n The NWB stimulation enabled significant productivity increment with accelerated production. It is customizable enabling design and placement of multiple micro-fractures. Additional hardware for wellbore isolation during treatment is not required. It is economical in comparison to conventional fracturing treatment and could be extended for cased or liner completions in vertical or deviated wells.","PeriodicalId":11182,"journal":{"name":"Day 3 Thu, October 25, 2018","volume":"83 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2018-10-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 3 Thu, October 25, 2018","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/191893-MS","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Well ‘A’ is a horizontal well drilled in the primary and productive upper layer of the carbonate reservoir just below 7,750 ft TVD, with lateral length of 3,495 ft. This layer, due to inherent well placement, presented completion and production challenges attributed to low permeability and with limited scope for production enhancement. The asset team required an effective solution to drain reserves from this well and for evaluating future well placements. Near-wellbore (NWB) acid stimulation technique was preferred over conventional acid fracturing due to low vertical stress contrast and high tortuosity effects caused by lateral azimuth relative to maximum stress orientation. Based on the Bernoulli concept for fluid diversion and using a dual path pumping system, initiation and propagation of micro-fractures was achieved by pumping fluid through tubing and annulus with a controlled pump schedule. A specially designed high-pressure tool was used for creating formation cavity by pumping acid through tubing. Increasing pressure on the bottom of cavity initiates micro-fracture causing annular fluid to be pulled into the fracture and subsequently extending it. The NWB stimulation was designed and carried out in 50 stages along the lateral. This was followed by 29-stage matrix acid stimulation using 20% HCl and with pulsonix tool for acid placement. Initial well productivity (PI) was estimated at 0.16 STB/D/psi. Post stimulation treatment resulted in a nine-fold PI improvement. Production post stimulation was 720 barrels oil per day (bopd) with 7% water cut (w.c). The NWB stimulation enabled significant productivity increment with accelerated production. It is customizable enabling design and placement of multiple micro-fractures. Additional hardware for wellbore isolation during treatment is not required. It is economical in comparison to conventional fracturing treatment and could be extended for cased or liner completions in vertical or deviated wells.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
科威特北部水平裸眼井增强近井酸性增产,增加了致密碳酸盐岩地层的流入——案例研究
A井是一口水平井,位于TVD低于7750英尺的碳酸盐岩储层上部初级生产层,横向长度为3495英尺。由于该层固有的井位,由于低渗透率和有限的增产空间,给完井和生产带来了挑战。资产团队需要一个有效的解决方案来排出该井的储量,并评估未来的井位。与常规酸压裂相比,近井酸性增产技术更受青睐,因为它具有较低的垂直应力对比和相对于最大应力方向的侧向方位角造成的高弯曲效应。基于伯努利流体导流概念,采用双通道泵送系统,通过控制泵送进度将流体泵入油管和环空,实现微裂缝的起裂和扩展。采用一种特殊设计的高压工具,通过泵送酸通过油管形成地层空腔。空腔底部压力的增加引发了微裂缝,导致环空流体被拉入裂缝并随后延伸。NWB增产措施的设计和实施分50段进行。随后使用20%的HCl进行29级基质酸化,并使用pulsonix工具进行酸化。初始井产能(PI)估计为0.16 STB/D/psi。增产后的处理使PI提高了9倍。增产后的产量为720桶/天,含水率为7%。NWB增产措施显著提高了产能,加快了生产速度。它是可定制的,可以设计和放置多个微裂缝。在处理过程中,不需要额外的井筒隔离硬件。与常规压裂处理相比,该技术经济实惠,可扩展到直井或斜井的套管井或尾管完井中。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Discrete Net-to-Gross Truncated Gaussian Simulation: An Alternative Modelling Approach for CSG Unconventional Reservoirs, Bowen Basin, Eastern Australia Where the Laterals Go? A Feasible Way for the Trajectory Measurement of Radial Jet Drilling Wells Embracing Opportunities and Avoiding Pitfalls of Probabilistic Modelling in Field Development Planning Efficient Integration Method of Large-Scale Reservoir Compaction and Small-Scale Casing Stability Models for Oilfield Casing Failure Analysis Monitoring Water Flood Front Movement by Propagating High Frequency Pulses Through Subsurface Transmission Lines
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1