Successful Delivery of Slim Well Design Concept for Future Marginal Fields

Nurul Nadia Ezzatty Abu Bakar, M. Hod, M. A. Abitalhah, A. F. Omar, Hazlan Abdul Hakim
{"title":"Successful Delivery of Slim Well Design Concept for Future Marginal Fields","authors":"Nurul Nadia Ezzatty Abu Bakar, M. Hod, M. A. Abitalhah, A. F. Omar, Hazlan Abdul Hakim","doi":"10.4043/31357-ms","DOIUrl":null,"url":null,"abstract":"\n This paper will discuss the key focus areas in successfully delivering a slim well design as a Proof Of Concept (POC) for marginal fields and well cost optimization.\n Well Tall-A is a Near Field Exploration (NFE) well targeting marginal reservoir which utilize the slim well concept; a 2-hole section well with 9-5/8\" as the conductor. For a successful well execution, three (3) key focus areas were identified which are successful operation of 9-5/8\" Casing While Drilling (CWD) to section TD, sustainability of 9-5/8\" casing as conductor for the whole well life cycle and achievement of well objectives.\n Tall-A recorded the longest and successful 9-5/8\" CWD Level 2 (non-directional) for Asia Pacific with 1168m drilled footage as of year 2020. Lessons learnt from previous PCSB 9-5/8\" CWD operation were incorporated for casing bit selection hence a heavy-set casing bit (8 bladed) which has been proven in drilling long hole interval in the Middle East (>1000m) was utilized. Continuous monitoring during execution is essential in ensuring the casing is set at the desired setting depth. Sustainability of the 9-5/8\" casing as conductor for the whole well life cycle is critical for a slim well design concept. Several studies and extensive discussions between multiple parties has been incorporated to enable utilization of the 9-5/8\" as conductor with required sufficient tension to sustain the exploration well lifecycle. A conductor study was performed which incorporated the Metocean data, rig data and connection Stress Concentration Fatigue (SCF) to qualify the 9-5/8\" as conductor. To meet the primary and secondary targets; the 8-1/2\" hole needs to be kicked-off early and build up to maximum 44 deg before maintain tangent to final TD at 2752m MDDF. Due to the long open hole (1475m) and well inclination within the avalanche hole cleaning regime (30 to 60 deg), the well is prone to hole cleaning problem and wellbore instability. Hence, it is critical to have good drilling practices and precise mud weight selection to ensure no hole problem encountered. The well was successfully drilled to TD, completed the well testing and P&A.\n In summary, well Tall-A successfully maneuvered all challenges to deliver the well safely that resulted in Best In Class (BIC) performance. The slim well design concept has been proven achievable and serve as base design for future marginal wells.","PeriodicalId":11011,"journal":{"name":"Day 3 Thu, March 24, 2022","volume":"70 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-03-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 3 Thu, March 24, 2022","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.4043/31357-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

This paper will discuss the key focus areas in successfully delivering a slim well design as a Proof Of Concept (POC) for marginal fields and well cost optimization. Well Tall-A is a Near Field Exploration (NFE) well targeting marginal reservoir which utilize the slim well concept; a 2-hole section well with 9-5/8" as the conductor. For a successful well execution, three (3) key focus areas were identified which are successful operation of 9-5/8" Casing While Drilling (CWD) to section TD, sustainability of 9-5/8" casing as conductor for the whole well life cycle and achievement of well objectives. Tall-A recorded the longest and successful 9-5/8" CWD Level 2 (non-directional) for Asia Pacific with 1168m drilled footage as of year 2020. Lessons learnt from previous PCSB 9-5/8" CWD operation were incorporated for casing bit selection hence a heavy-set casing bit (8 bladed) which has been proven in drilling long hole interval in the Middle East (>1000m) was utilized. Continuous monitoring during execution is essential in ensuring the casing is set at the desired setting depth. Sustainability of the 9-5/8" casing as conductor for the whole well life cycle is critical for a slim well design concept. Several studies and extensive discussions between multiple parties has been incorporated to enable utilization of the 9-5/8" as conductor with required sufficient tension to sustain the exploration well lifecycle. A conductor study was performed which incorporated the Metocean data, rig data and connection Stress Concentration Fatigue (SCF) to qualify the 9-5/8" as conductor. To meet the primary and secondary targets; the 8-1/2" hole needs to be kicked-off early and build up to maximum 44 deg before maintain tangent to final TD at 2752m MDDF. Due to the long open hole (1475m) and well inclination within the avalanche hole cleaning regime (30 to 60 deg), the well is prone to hole cleaning problem and wellbore instability. Hence, it is critical to have good drilling practices and precise mud weight selection to ensure no hole problem encountered. The well was successfully drilled to TD, completed the well testing and P&A. In summary, well Tall-A successfully maneuvered all challenges to deliver the well safely that resulted in Best In Class (BIC) performance. The slim well design concept has been proven achievable and serve as base design for future marginal wells.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
成功交付未来边缘油田小井设计理念
本文将讨论成功交付小井设计的关键领域,作为边际油田的概念验证(POC)和井成本优化。Tall-A井是利用小井概念开发的边缘油气藏近场勘探井;以9-5/8”为导体的2孔分段井。为了成功的钻井作业,确定了三个关键的重点领域,即9-5/8”随钻套管(CWD)的成功作业到TD段,9-5/8”套管在整个井生命周期中的可持续性以及井目标的实现。截至2020年,Tall-A在亚太地区创下了最长且成功的9-5/8”CWD 2级(非定向)钻井记录,钻井进尺为1168米。从之前的PCSB 9-5/8”CWD作业中吸取的经验教训被用于套管钻头的选择,因此使用了重型套管钻头(8片),该钻头在中东的长井段(>1000米)的钻井中得到了验证。在执行过程中,连续监测对于确保套管在所需的坐封深度下坐封至关重要。在整个井生命周期内,9-5/8”套管作为导管的可持续性对于小井设计理念至关重要。各方进行了多次研究和广泛讨论,最终确定了采用9-5/8”作为导通,并提供足够的张力,以维持探井的生命周期。结合metoocean数据、钻机数据和连接应力集中疲劳(SCF),进行了一项导线研究,以确定9-5/8”为导线。完成主要目标和次要目标;8-1/2”井眼需要尽早起下钻,并最大达44度,然后在MDDF 2752米处与最终TD保持相切。由于裸眼井长(1475米),井斜在雪崩井眼清洗范围内(30 ~ 60度),容易出现井眼清洗问题和井筒不稳定。因此,良好的钻井作业和精确的泥浆比重选择至关重要,以确保不会遇到任何井眼问题。该井成功钻至TD,完成了试井和弃井作业。综上所述,Tall-A井成功应对了所有挑战,安全交付了该井,取得了同类最佳(BIC)性能。小井设计理念已被证明是可行的,并可作为未来边际井的基础设计。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Integrated Advance Petrophysical Evaluation for Heterolithic Clastics Reservoir Characterization Optimization in Malay Basin The Transformation Journey and Key Critical Success Factors of Turbomachinery Digital Remote Monitoring Biggest Wells Plug and Abandonment Campaign – Effective Management & Best Practices Implementation Zawtika Deferment Management Enhancement: A Systematic Way to Unlock Gas Potential for Optimized Operations Breakthrough Integration of 3-1/2? Tubing in 8-1/2? Hole Cemented Monobore for Successful Tubing Stem Test TST
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1