{"title":"Behaviour of a Suspended Wellbay Module and Flare Tower in Waves During Transit to Shore","authors":"H. Chan, Evren Armaoğlu, M. Thomson, Alistair Garner","doi":"10.1115/omae2019-95001","DOIUrl":null,"url":null,"abstract":"\n The extended lift operation to deliver the Wellbay module (M5) combined with the Flare Tower (M8) from the Miller Platform in the North Sea to the shore using the Semi-Submersible Crane Vessel S7000 was restricted by the clearances between M5/M8 and the vessel crane booms. A method to calculate the clearances of the M5/M8 normal to the vessel crane booms has been developed and used in a frequency-domain response analysis to define operability limits. Investigations based on a series of scale model tests in regular waves and irregular short-crested waves including motion decay tests in calm water, conducted by the Maritime Research Institute (MARIN) in the Netherlands, were also made to further evaluate the behaviour of the suspended M5/M8 on S7000’s main hooks during transit. The time series of decay motions of the suspended M5/M8 obtained from the decay motion tests and a time domain analysis are compared and used to derive rigging damping. The numerical results of the frequency-domain analysis are validated with the experimental data for response amplitude operators (RAOs) found in regular waves and pink noise waves, significant and 3 hour most probable maximum/minimum (MPM) responses of interest in irregular waves.","PeriodicalId":23567,"journal":{"name":"Volume 1: Offshore Technology; Offshore Geotechnics","volume":"12 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2019-11-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Volume 1: Offshore Technology; Offshore Geotechnics","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1115/omae2019-95001","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The extended lift operation to deliver the Wellbay module (M5) combined with the Flare Tower (M8) from the Miller Platform in the North Sea to the shore using the Semi-Submersible Crane Vessel S7000 was restricted by the clearances between M5/M8 and the vessel crane booms. A method to calculate the clearances of the M5/M8 normal to the vessel crane booms has been developed and used in a frequency-domain response analysis to define operability limits. Investigations based on a series of scale model tests in regular waves and irregular short-crested waves including motion decay tests in calm water, conducted by the Maritime Research Institute (MARIN) in the Netherlands, were also made to further evaluate the behaviour of the suspended M5/M8 on S7000’s main hooks during transit. The time series of decay motions of the suspended M5/M8 obtained from the decay motion tests and a time domain analysis are compared and used to derive rigging damping. The numerical results of the frequency-domain analysis are validated with the experimental data for response amplitude operators (RAOs) found in regular waves and pink noise waves, significant and 3 hour most probable maximum/minimum (MPM) responses of interest in irregular waves.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
悬挂式井湾模块和火炬塔在波浪中向岸上运输的行为
使用半潜式起重船S7000将Wellbay模块(M5)和火炬塔(M8)从北海的Miller平台运送到岸上,但M5/M8与船吊臂之间的间隙限制了作业的进行。已经开发了一种计算M5/M8垂直于船舶起重机臂架间隙的方法,并将其用于频域响应分析,以确定可操作性限制。荷兰海事研究所(MARIN)还在规则波和不规则短峰波中进行了一系列比例模型试验,包括在平静水中进行的运动衰减试验,以进一步评估S7000主钩上悬挂的M5/M8在运输过程中的行为。将衰减运动试验得到的M5/M8悬架衰减运动时间序列与时域分析结果进行了比较,并用于索具阻尼的推导。频域分析的数值结果与在规则波和粉红噪声波中发现的响应幅度算子(RAOs)、不规则波中显著和3小时最可能最大值/最小值(MPM)响应的实验数据进行了验证。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Influence of Different Pile Installation Methods on Dense Sand Estimating Second Order Wave Drift Forces and Moments for Calculating DP Capability Plots A Conjoint Analysis of the Stability and Time-Domain Analysis on Floating Platform During Mooring Line Breaking Wave Propagation in CFD-Based Numerical Wave Tank CFD Analysis on Hydrodynamic Characteristics for Optimizing Torpedo Anchors
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1