{"title":"Guyana Operations and First Oil","authors":"M. Ryan, Brian Unietis, A. Kaverzin, Travys Townson, James Steves, C. Chew, Mark Maggard, Justin Jones, Brendan R. McGehee, K. Minnaar","doi":"10.4043/30979-ms","DOIUrl":null,"url":null,"abstract":"\n The Liza Phase 1 development project features the Liza Destiny Floating Production, Storage, and Offloading (FPSO) vessel, moored 190 km offshore Guyana in 1,743 m (5,719 ft) of water, and four subsea drill centers supporting 17 wells. Not only was this a Greenfield development that required an integrated team to prepare for Operations; it was also located in a New Frontier that required development of logistics and marine infrastructure to support multi drillship and FPSO operations in challenging metocean and tidal conditions. In addition, early operations and production testing was further complicated by the COVID-19 pandemic and safety protocols put in place to keep the workforce safe.\n Three aspects of achieving First Oil are discussed, highlighting challenges and lessons learned:\n Managing subsea completions, well cleanup, and flow assurance while drilling was ongoing Enabling accurate data collection from Multi-Phase Flow Meters (MPFMs) and downhole pressure gauges, which was critical to developing foundational understanding of well performance for reservoir characterization and management Establishing an integrated asset team and workflows to ensure life cycle value capture by managing complex marine operations, commissioning, and surveillance while meeting stringent COVID-19 protocols\n Lessons learned from Destiny Operations will be incorporated into future projects, including a robust digital strategy centered on a fiber ring to shore, which will enable high-speed communications for future FPSOs, and an onshore integrated operations control center for improvement of long-term operations. Early understanding of reservoir connectivity and performance from data collection will continue to inform the reservoir management strategy so as to maximize asset value for the country of Guyana.","PeriodicalId":11072,"journal":{"name":"Day 1 Mon, August 16, 2021","volume":"6 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2021-08-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 1 Mon, August 16, 2021","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.4043/30979-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

Abstract

The Liza Phase 1 development project features the Liza Destiny Floating Production, Storage, and Offloading (FPSO) vessel, moored 190 km offshore Guyana in 1,743 m (5,719 ft) of water, and four subsea drill centers supporting 17 wells. Not only was this a Greenfield development that required an integrated team to prepare for Operations; it was also located in a New Frontier that required development of logistics and marine infrastructure to support multi drillship and FPSO operations in challenging metocean and tidal conditions. In addition, early operations and production testing was further complicated by the COVID-19 pandemic and safety protocols put in place to keep the workforce safe. Three aspects of achieving First Oil are discussed, highlighting challenges and lessons learned: Managing subsea completions, well cleanup, and flow assurance while drilling was ongoing Enabling accurate data collection from Multi-Phase Flow Meters (MPFMs) and downhole pressure gauges, which was critical to developing foundational understanding of well performance for reservoir characterization and management Establishing an integrated asset team and workflows to ensure life cycle value capture by managing complex marine operations, commissioning, and surveillance while meeting stringent COVID-19 protocols Lessons learned from Destiny Operations will be incorporated into future projects, including a robust digital strategy centered on a fiber ring to shore, which will enable high-speed communications for future FPSOs, and an onshore integrated operations control center for improvement of long-term operations. Early understanding of reservoir connectivity and performance from data collection will continue to inform the reservoir management strategy so as to maximize asset value for the country of Guyana.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
圭亚那公司和第一石油公司
Liza一期开发项目的特点是Liza Destiny浮式生产、储存和卸载(FPSO)船,停泊在圭亚那近海190公里处,水深1743米(5719英尺),四个海底钻井中心支持17口井。这不仅是一个全新的开发,需要一个整合的团队来为运营做准备;它还位于一个新的前沿地区,需要发展物流和海洋基础设施,以支持多艘钻井船和FPSO在具有挑战性的海洋和潮汐条件下的作业。此外,由于COVID-19大流行和为保证劳动力安全而制定的安全协议,早期运营和生产测试进一步复杂化。讨论了实现第一石油的三个方面,突出了挑战和经验教训:通过多相流量计(MPFMs)和井下压力表进行精确的数据收集,这对于油藏特征和管理的基本认识至关重要。建立一个综合的资产团队和工作流程,通过管理复杂的海上作业、调试、从命运行动中吸取的经验教训将纳入未来的项目,包括以光纤环到岸上为中心的强大数字战略,这将为未来的fpso提供高速通信,以及陆上综合作业控制中心,以改善长期作业。通过数据收集对油藏连通性和性能的早期了解将继续为油藏管理战略提供信息,从而使圭亚那国家的资产价值最大化。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Drilling Fluids Project Engineering Guidance and Most Common Fluids Related Challenges for Deepwater and HPHT Offshore Wells Empirical Design of Optimum Frequency of Well Testing for Deepwater Operation Sustaining Oil and Gas Fields by Using Multiphase Gas Compression to Increase Production and Reserves, and Lower Operating Costs and Environmental Emissions Footprint Structural Digital Twin of FPSO for Monitoring the Hull and Topsides Based on Inspection Data and Load Measurement Application of LWD Multipole Sonic for Quantitative Cement Evaluation – Well Integrity in the Norwegian Continental Shelf
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1